The agreement and physical link that lets a data centre draw a set amount of power from the grid, now the main limit on where data centres can be built.

Also: power availability, utility connection

A grid connection gives a data centre the right to draw a set number of megawatts from the network, and the lines and substation to do it. In the 2020s, available grid capacity became the scarcest input for data centres, ahead of land and fibre. In Dublin, the grid operator EirGrid limited new data centre connections from 2022; Amsterdam and Singapore paused new building for a time. Developers now hunt for sites with power before anything else.