375 Pearl Street
A 32-storey Manhattan tower combining offices with a data centre and telephone exchange.
375 Pearl Street is a 32-storey office and data centre tower in the Civic Center area of Lower Manhattan, at the Manhattan side of the Brooklyn Bridge. Finished in 1975 for New York Telephone, it was bought by Sabey Data Centers Properties in 2011 and refitted from 2016, with its upper limestone walls replaced by glass.
- Completed in 1975 for New York Telephone, with 32 storeys and a 540 ft (165 m) roof.
- About 1.098 million sq ft (102,000 m2) of floor area, with 16 to 17 ft ceilings and 39,000 sq ft plates.
- Sabey Data Centers Properties took the deed in lieu of foreclosure in June 2011 for $120 million.
- Limestone on the top 15 levels was replaced with plate glass during the 2016 to 2018 refit.
- Its telephone-exchange CLLI code was NYCMNYPS.
What it is
375 Pearl Street is a 32-storey building in the Civic Center district of Lower Manhattan, New York City, standing at the Manhattan end of the Brooklyn Bridge. It holds both offices and a data centre, and it also served as a telephone exchange. The tower reaches 540 ft (165 m) and offers about 1.098 million sq ft (102,000 m2) of floor space across 32 levels. Rose, Beaton & Rose designed it. Sabey Data Centers Properties owns the property today, having taken it over in 2011 and refitted it as a Manhattan data centre and technology building called Intergate.Manhattan.
How it came about
New York Telephone commissioned the tower and it was completed in 1975. In the 1990s and 2000s Verizon ran switching gear there, including a small DMS-100 exchange and a Switching Control Center System. A Verizon sign replaced the earlier New York Telephone and Bell Atlantic logos in 2002. Taconic Investment Partners bought the building from Verizon in September 2007 for $172.05 million, with Verizon leasing back floors 8 to 10. Sabey Data Centers Properties took the deed in lieu of foreclosure from M&T Bank in June 2011 for $120 million. Refitting began in 2016 and ran to 2018. Sabey and National Real Estate Advisors refinanced in June 2021 with a $220 million fixed-rate loan and a $30 million mezzanine loan from Wells Fargo and JPMorgan Chase.
The building and the halls
The tower has 32 storeys and a roof height of 540 ft (165 m), with roughly 1.098 million sq ft (102,000 m2) of floor area. Rose, Beaton & Rose were the architects. At first the exterior looked windowless, broken only by slits about 3 ft (0.91 m) wide running up the height, some glazed. Ceilings measure 16 to 17 ft (5.2 m) and typical floor plates cover 39,000 sq ft (3,600 m2). From 2016 the limestone cladding on the top 15 levels was stripped away and plate glass panels put in place, to freshen the look and draw ordinary office occupiers. Leasing of the office levels began in January 2016.
What runs inside
Telecommunications occupiers dominated the address for years, but after the refit a range of ordinary office users arrived. New York City bodies take a large share of the space: the Police Department holds 106,000 sq ft (9,800 m2) on floors 15 to 17, the Human Resources Administration 194,000 sq ft (18,000 m2), the Department of Finance 175,000 sq ft (16,300 m2) and the Department of Sanitation 72,000 sq ft (6,700 m2). An office for mayor Eric Adams was set up there after the 2021 mayoral election. Rafael Vi帽oly Architects took a 20-year lease on floor 31 covering 36,550 sq ft (3,396 m2) in July 2018 and bought the levels it occupied in July 2020.
The place
The site sits in the Civic Center part of Lower Manhattan, right at the Manhattan foot of the Brooklyn Bridge. Sabey's president John Sabey said the reborn Intergate.Manhattan would suit new scientific, academic and medical research centres alongside data centre customers. The building drew sharp comment early on: New York Times critic Paul Goldberger called it the most disturbing of the phone company's new switching centres, saying it dwarfed the bridge towers, cast a residential area into shade and set a tone of utter banality. In 2012 The Daily Telegraph placed it 20th among the world's ugliest buildings.
Environment and impact
Judgements about the tower's looks have been harsh. Paul Goldberger attacked its effect on the bridge and the nearby homes when it neared completion, and The Daily Telegraph listed it among the world's least attractive buildings in 2012. Taconic's co-chief executive Paul E. Pariser recounted a reporter comparing the task to turning a G.E. dishwasher into offices, a challenge he said he welcomed. The 2016 to 2018 refit, which swapped upper limestone for glass, aimed to soften the appearance and pull in conventional office tenants.
Network and links
Verizon's switching work at the address included a small DMS-100 telephone exchange and a Switching Control Center System during the 1990s and 2000s. Its CLLI code, the industry identifier, was NYCMNYPS. A Pearl Street CS2K softswitch there took in voice traffic from old city switches that had been retired.


Questions people ask about 375 Pearl Street
What is 375 Pearl Street?
It is a 32-storey tower in Lower Manhattan that combines offices with a data centre and once worked as a telephone exchange. New York Telephone had it built and it was finished in 1975. Sabey Data Centers Properties owns it now and markets it as Intergate.Manhattan.
Who owns and runs the building?
Sabey Data Centers Properties bought the deed in lieu of foreclosure from M&T Bank in June 2011 for $120 million, with National Real Estate Advisors as development partner. Taconic Investment Partners had earlier bought it from Verizon in September 2007 for $172.05 million.
How large is the building?
The tower has 32 storeys, a roof at 540 ft (165 m) and about 1.098 million sq ft (102,000 m2) of floor area. Ceilings run 16 to 17 ft (5.2 m) and typical floor plates measure 39,000 sq ft (3,600 m2).
Who occupies space there?
New York City bodies take much of the building: the Police Department on floors 15 to 17, plus the Human Resources Administration, Department of Finance and Department of Sanitation. Rafael Vi帽oly Architects leased floor 31 in July 2018 and later bought the levels it used.
What changed in the 2016 refit?
Work from 2016 to 2018 took the limestone off the top 15 storeys and put plate glass panels in its place. The aim was to improve the look and draw ordinary office tenants. Leasing of the office levels started in January 2016.
Good reading and sources
- Official websiteOfficial site
- Sabey Acquires Huge Verizon Building in NYCData Center Knowledge, Article
- Open a New Window: A Tower With a View (Published 2008)The New York Times, Article
- 375 Pearl Street on WikipediaEncyclopedia
- More photos on Wikimedia CommonsPhotos
- Wikidata recordOpen data
The facts on this page come from the Wikipedia article "375 Pearl Street", written by its contributors and used under the CC BY-SA 4.0 licence, and from its Wikidata record (CC0). EveryDatacenter rewrote the text in its own words, with AI assistance, and compares every page with the article to make sure no passage is copied. It may be reused under the same CC BY-SA 4.0 licence with a link back.
It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.