CapitaLand DC Mumbai
AI-ready data centre campus in Navi Mumbai, India
CapitaLand Investment is developing two data centre towers in Navi Mumbai as part of a portfolio targeting hyperscale and enterprise clients. The facilities are designed to support artificial intelligence workloads with secured power capacity.
- Combined gross power capacity of 200 MW across three sites
- Designed to be AI-ready for hyperscale workloads
- Located in Navi Mumbai within established data corridors
- Part of CapitaLand India Data Centre Fund portfolio
What it is
CapitaLand DC Mumbai comprises two towers located in Navi Mumbai. These facilities are currently under development by CapitaLand Investment. The site is designed to be ready for artificial intelligence applications. It aims to serve the needs of hyperscale cloud providers and large business customers. The project forms part of a wider portfolio of three data centres in India. Power supply has been secured for the entire group of assets.
How it came about
CapitaLand Investment announced the first close of its India Data Centre Fund in January 2026. This fund raised approximately S$150 million in equity. The capital allows the firm to acquire a 20.2 per cent stake in three existing projects. This transaction includes the Mumbai towers. The company plans to reach a final fund size of around S$300 million. The move supports their strategy to expand within Indian data corridors.
The building and the halls
The campus consists of Tower 1 and Tower 2. Both structures are being built with sustainable design features. The developer states they are prepared for high-density computing loads. Specific details on floor area or security tiers are not provided in the available records. The focus remains on creating infrastructure that meets modern enterprise standards.
Power and cooling
The three data centres in this portfolio have a combined gross power capacity of 200 megawatts. Electricity supply has been secured for all projects. This capacity is intended to support energy-intensive tasks such as AI training. The design incorporates sustainability measures to manage this demand. No specific cooling technologies or renewable energy sources were detailed in the announcement.
What runs inside
These facilities target hyperscalers and large enterprises. They are described as AI-ready, meaning they can handle graphics processing units and other hardware used for machine learning. The location places them within an established data centre corridor. This provides necessary network connectivity for cloud services and digital operations.
The place
Navi Mumbai is a key node in India鈥檚 data centre landscape. The region offers access to power and fibre networks. CapitaLand has operated in India for over thirty years. They hold assets in eight cities including Bangalore and Chennai. This local presence helps navigate regulatory and logistical requirements for construction.
Environment and impact
The project contributes to the doubling of data centre capacity expected in India by 2027. It attracts private capital into the infrastructure sector. The developer emphasises sustainable design to mitigate environmental impact.
Network and links
The sites are situated in established data centre corridors. This positioning ensures access to robust network connectivity. Such links are vital for hyperscalers requiring low latency and high bandwidth. Specific peering arrangements or subsea cable connections were not listed.
Questions people ask about CapitaLand DC Mumbai
Who owns the CapitaLand DC Mumbai towers?
The assets are held by CapitaLand India Trust. CapitaLand Investment manages the properties and recently sold a 20.2 per cent interest in them to its new India Data Centre Fund.
What is the power capacity of the Mumbai site?
The Mumbai towers are part of a three-site portfolio with a combined gross capacity of 200 megawatts. Power has been secured for all three projects to support high-demand users.
What type of customers will use these data centres?
The facilities are built to meet the demands of hyperscalers and large enterprises. They are specifically designed to be AI-ready, supporting artificial intelligence and cloud computing workloads.
Good reading and sources
There is no English Wikipedia article on CapitaLand DC Mumbai yet, so the facts on this page come from the sources listed above: finance.yahoo.com/news/capitaland-india-data-centre-fund-010000152.htm. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.
It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.