News
EveryDatacenter
DataVolt

DataVolt

Saudi data centre developer building AI-ready facilities

DataVolt is a Saudi Arabian developer of data centres, founded in 2023 as a subsidiary of Vision Invest. It plans to build AI-ready facilities in Riyadh and Neom, with a committed investment of over $5 billion for around 300MW of capacity.

Share on WhatsApp

  • Founded in 2023 as a Vision Invest subsidiary
  • Plans 300MW capacity with $5bn investment
  • Riyadh site covers 55,000 square metres
  • Neom campus planned at 1.5GW capacity
  • First Neom phase to go live in 2028

What it is

DataVolt is a data centre developer based in Riyadh, Saudi Arabia. Founded in 2023, it operates as a wholly owned subsidiary of Vision Invest, a holding company focused on critical infrastructure. The firm specialises in building AI-ready digital infrastructure to support the Kingdom’s technology goals. It has announced plans for facilities in Riyadh and the Neom region, aiming to deliver sustainable solutions for high-performance computing needs.

How it came about

The company was established in 2023 under the ownership of Vision Invest. Its presence became public during the LEAP 2025 conference, where the Saudi Authority for Industrial Cities and Technology Zones (MODON) announced land lease agreements. These contracts included deals with DataVolt, GDH, and Ezditek. The announcement marked the start of its development pipeline in the country, aligning with national economic diversification strategies.

The building and the halls

In Riyadh, DataVolt has secured a 55,000 square metre plot in the First Technology Park in east Riyadh. This site is designated for an AI-ready facility. The company also plans a larger campus in Neom’s Oxagon industrial area. The first phase of the Neom project is scheduled to become operational in 2028. Specific design details for the Riyadh building remain undisclosed.

Power and cooling

DataVolt has committed to investing more than $5 billion to develop approximately 300 megawatts of data centre capacity in Saudi Arabia. The Riyadh project alone represents an investment of 2.5 billion riyals, roughly $670 million. The Neom campus is planned with a total capacity of 1.5 gigawatts. The company states it aims to offer sustainable solutions, though specific energy sources are not detailed in the available records.

What runs inside

The facilities are designed to be AI-ready, supporting the Kingdom’s ambition to become a global leader in artificial intelligence. The infrastructure is intended for mission-critical digital workloads. By focusing on AI and high-performance computing, the company targets customers requiring substantial processing power and low-latency connectivity for advanced technological applications.

The place

Riyadh was chosen for its strategic position within the Saudi technology sector. The site lies within the First Technology Park, managed by MODON. This location supports the government’s Vision 2030 programme, which seeks to diversify the economy beyond oil. The development is part of a broader effort to establish the country as a hub for digital infrastructure and industrial technology.

Environment and impact

The projects are framed as contributions to Saudi Vision 2030, supporting economic diversification and sustainability. The company claims its steps align with government goals for society and the economy. By developing critical digital infrastructure, DataVolt aims to enhance the nation’s technological standing. The investment brings significant capital into the local industrial zones, fostering growth in the tech sector.

Questions people ask about DataVolt

Who owns DataVolt?

DataVolt is a wholly owned subsidiary of Vision Invest. This Saudi Arabian holding company focuses on development and investment in critical infrastructure sectors.

Where is DataVolt building data centres?

The company has announced projects in Riyadh, specifically in the First Technology Park, and in Neom’s Oxagon industrial area. It has also mentioned plans for facilities in Dhaka and Uzbekistan.

What is the capacity of the Neom project?

DataVolt plans to develop a 1.5 gigawatt data centre campus in Neom. The first phase of this site, with a capacity of 300 megawatts, is reported to go live in 2028.

Good reading and sources

    Where this page comes from

    There is no English Wikipedia article on DataVolt yet, so the facts on this page come from the sources listed above: datacenterdynamics.com/en/news/saudis-datavolt-to-develop-data-center-. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.

    It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.

    The weekly digest

    Every Monday: the data centre of the day, new pages on EveryDatacenter, and the conferences and anniversaries of the week ahead.