News
EveryDatacenter
The Massachusetts Green High Performance Computing Center , the newest building completed in the Holyoke Canal System and a collaboration between several universities and corporate sponsors including the University of Ma

Massachusetts Green High Performance Computing Center

University-run supercomputer centre in Holyoke, Massachusetts, powered mainly by hydroelectricity.

Photo: Simtropolitan, CC0, via Wikimedia Commons

MGHPCC is a shared high-performance computing building in Holyoke, Massachusetts, opened in 2012 and run for a group of six universities. It draws most of its electricity from local hydro power and hosts research clusters used by its partner institutions.

Share on WhatsApp

  • Opened November 2012 on an 8.6-acre campus in Holyoke, Massachusetts
  • Powered mainly by hydroelectricity from Holyoke Gas & Electric
  • In 2017, over 94% of its electricity demand was carbon-neutral
  • Hosts clusters totalling hundreds of thousands of processor cores
  • $16 million quantum computing expansion announced in October 2024

What it is

The Massachusetts Green High Performance Computing Center is a shared supercomputing building at 100 Bigelow Street in Holyoke, Massachusetts. Six university systems run it together: Boston University, Harvard, MIT, Northeastern, the University of Massachusetts and Yale. The site covers 8.6 acres. Inside, partner institutions keep clusters that together offer hundreds of thousands of processor cores. One UMass system in 2016 ran 14,376 Intel and AMD cores with over 1.1 petabytes of local storage on an FDR InfiniBand network. The building is designed so partners can keep adding capability, and more than 4 acres of the site are still undeveloped.

How it came about

Planning began in early 2009 through talks between MIT and UMass, with UMass president Jack M. Wilson pushing the idea and later chairing the board. Boston University, Northeastern and Harvard signed on soon after. Holyoke was picked on 11 June 2009, and the exact plot, once home to a textile mill, was named on 9 August 2010. Construction started on 5 October 2011, the structure was topped out on 29 November that year, and the centre finished in November 2012. In October 2024 a $16 million growth plan was announced, adding a quantum computing complex with Boston partner QuEra Computing.

The building and the halls

The centre sits on an 8.6-acre campus beside the canals of Holyoke. Its plot had held a textile mill a century earlier. The main building was completed in November 2011-2012 and has room for regular upgrades by the partner universities. More than 4 acres of the campus remain empty and available for future construction. The site was chosen partly for the city's municipal fibre grid and its hydroelectric power supply.

Power and cooling

Electricity comes from Holyoke Gas & Electric, which worked with the consortium on site choice and contracted green power from its hydro plants. Between 2011 and 2013 the utility built the North Canal Substation on Water Street, feeding the centre through two dedicated 34.5 kV lines. The centre shares that 34.5 kV bus only with the Hadley Falls hydro station, the largest of the utility's hydro facilities, giving a direct path from the plant. Two 115 kV/34.5 kV transformers link the bus to the wider grid, covering demand when the hydro station is offline or short of output, and sending surplus power back out when the plant produces more than the centre needs. In 2017 about 66.7% of the roughly 400 MWh used each year came from hydro, and with nuclear, solar and other contracted carbon-free supply, more than 94% of demand was carbon-neutral.

Massachusetts Green High Perfo
A drawing made by EveryDatacenter from what this page says. It is a diagram, not a picture of the real data centre.

What runs inside

The building serves research groups from the partner universities, running clusters that together hold hundreds of thousands of cores. Work there has covered molecular geometry modelling, stellar wind behaviour, resilience of renewable energy systems and neural circuitry. It also processes data for the Mass Open Cloud, a Boston University-led effort to build a decentralised public cloud using the Open Cloud eXchange model.

The place

Holyoke was chosen in June 2009. The city offered a municipal fibre network and hydroelectric power from its canal system and dam, both important to the decision. The U.S. Department of Commerce put $2.1 million into upgrading hydro infrastructure to support the centre and other firms in the city's Innovation District.

Environment and impact

The centre runs largely on carbon-free electricity; a 2017 study found more than 94% of its demand was carbon-neutral. Construction was backed by the five university partners, with $25 million pledged by the state of Massachusetts and further help from Cisco Systems and EMC Corporation. The Commerce Department's $2.1 million hydro upgrade was aimed at the centre and similar businesses in Holyoke.

Network and links

The centre connects to Holyoke's municipal fibre grid. A dedicated 10 Gbps link was built for its educational affiliates, who use specialised networks such as the Internet2 consortium.

Questions people ask about Massachusetts Green High Performance Computing Center

Who runs the MGHPCC?

It is operated for a group of six university partners: Boston University, Harvard, MIT, Northeastern, the University of Massachusetts system and Yale. John Goodhue serves as director, and Robert A. Brown has chaired the board since 2011.

How is it powered?

Holyoke Gas & Electric supplies it, mostly from hydroelectric generation. A dedicated substation feeds the building at 34.5 kV, sharing a bus with the Hadley Falls hydro plant, with grid transformers covering any shortfall.

What research happens there?

Partner universities run clusters for work on molecular geometry, stellar winds, renewable energy resilience and neural circuitry. The site also processes data for the Mass Open Cloud project led by Boston University.

Is the site still growing?

Yes. More than 4 acres of the campus remain undeveloped, and in October 2024 a $16 million expansion was announced to add a quantum computing complex with QuEra Computing.

Good reading and sources

Where this page comes from

The facts on this page come from the Wikipedia article "Massachusetts Green High Performance Computing Center", written by its contributors and used under the CC BY-SA 4.0 licence, and from its Wikidata record (CC0). EveryDatacenter rewrote the text in its own words, with AI assistance, and compares every page with the article to make sure no passage is copied. It may be reused under the same CC BY-SA 4.0 licence with a link back.

It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.

Photo credits on this page

The small pictures above come from Wikimedia Commons under free licences. Some are cropped to fit.

The weekly digest

Every Monday: the data centre of the day, new pages on EveryDatacenter, and the conferences and anniversaries of the week ahead.