NTT Tokyo Inzai campus
50 MW colocation campus in Shiroi City for AI and cloud workloads.
NTT Global Data Centers is building a two-building data centre campus in Shiroi City, Japan. The first phase offers 24 MW of IT load with availability in 2027, supporting hyperscalers and enterprises with direct liquid cooling.
- Total campus capacity reaches 50 MW across two buildings.
- First phase delivers 24 MW with April 2027 availability.
- Uses direct liquid cooling for high-density AI workloads.
- Located in Shiroi City, 30 km east of central Tokyo.
- Developed by joint venture of NTT and Tepco Power Grid.
What it is
The NTT Tokyo Inzai campus is a new colocation facility located in Shiroi City, just outside central Tokyo. Developed by NTT Global Data Centers Japan in partnership with Tepco Power Grid, the site will provide 50 megawatts of IT capacity across two buildings. The first structure, known as TKY11 or SHR1, delivers 24 megawatts and 7,360 square metres of server space. It targets hyperscalers and large enterprises needing secure infrastructure for artificial intelligence and cloud computing without owning physical assets.
How it came about
NTT and Tepco Power Grid formed a joint venture to develop data centres in Japan. They announced plans for 50 megawatts of capacity in the Inzai-Shiroi area. Initial expectations placed the first phase delivery in the second half of 2026. Later updates indicated a completion date of April 2027 for the first building. A ground-breaking ceremony marked the start of construction for the 24-megawatt facility, which is the first phase of the wider campus project.
The building and the halls
The campus consists of two buildings situated in an industrial zone in Shiroi City. The first building provides 7,360 square metres of server-room space. Design features include dual power receiving systems and twenty-four-hour security monitoring. The infrastructure supports high-density workloads and is described as AI-ready. Carrier-neutral connectivity allows tenants to design flexible network architectures within the secure environment.
Power and cooling
The full campus will supply 50 megawatts of IT load. The initial phase contributes 24 megawatts, with a second building adding 26 megawatts later. Power is delivered via dual receiving lines to reduce operational risk. Cooling systems include direct liquid cooling and N+1 redundant air cooling. These methods support high-density computing required for next-generation applications and artificial intelligence training.
What runs inside
The facility serves hyperscalers and enterprise clients who wish to avoid the overhead of owning data centres. It supports cloud computing, artificial intelligence, and digital services. By using this colocation service, companies can focus on application innovation rather than facility management. The carrier-neutral model enables various network providers to connect, offering flexibility for complex IT system designs.
The place
Shiroi City lies in Chiba Prefecture, approximately 30 kilometres east of central Tokyo. It is a forty-minute drive from Narita International Airport and twenty minutes from Inzai City. The area is designated as an industrial zone and serves as a hub for large-scale data centres. High demand for expanded services in this region drove the selection of this site for new development.
Environment and impact
As the first data centre in this newly designated industrial zone, the project aims to support local industrial advancement. It addresses the growing need for digital infrastructure in the Greater Tokyo area. The joint venture between NTT and Tepco Power Grid reflects a strategic move to expand capacity in a region with significant demand for cloud and AI services.
Network and links
The data centre offers carrier-neutral connectivity. This setup allows multiple network providers to interconnect within the facility. Tenants can design flexible network architectures to suit their specific requirements. The location supports robust fibre connections typical of major Japanese data centre hubs near Tokyo.
Questions people ask about NTT Tokyo Inzai campus
When will the NTT Tokyo Inzai campus open?
The first building, providing 24 megawatts of capacity, is scheduled for completion in April 2027. The second building will follow to complete the 50 megawatt campus.
What cooling technology does the facility use?
The campus employs direct liquid cooling to handle high-density workloads. It also features N+1 redundant air cooling systems to ensure reliability and reduce operational risks for tenants.
Who owns and operates the data centre?
NTT Global Data Centers Japan operates the facility. It was developed through a joint venture with Tepco Power Grid to expand data centre capacity in the Greater Tokyo area.
Where is the data centre located?
The campus is in Shiroi City, Chiba Prefecture. It is about 30 kilometres east of central Tokyo, 40 minutes from Narita Airport, and 20 minutes from Inzai City.
Good reading and sources
There is no English Wikipedia article on NTT Tokyo Inzai campus yet, so the facts on this page come from the sources listed above: nttdata.com/en-in/services/global-data-centers/global-locations/asia-p, datacenterdynamics.com/en/news/ntt-breaks-ground-on-data-center-campus. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.