JH1

JH1

A 200 MW data centre campus in Johor, Malaysia.

JH1 is a hyperscale data centre campus operated by Princeton Digital Group in Sedenak Tech Park, Johor. It supports high-density AI and cloud workloads with a planned capacity of 200 MW, serving as a key infrastructure hub for the Asia Pacific region.

Share on WhatsApp

  • Located in Sedenak Tech Park, Johor, Malaysia
  • Planned total power capacity of 200 megawatts
  • First 52 MW phase delivered in twelve months
  • Secured USD 1.3 billion in green financing
  • Achieved GBI Gold and LEED Gold certifications

What it is

JH1 is a large-scale data centre campus located in Sedenak Tech Park within the state of Johor, Malaysia. Operated by Princeton Digital Group, the facility is designed to handle high-density computing tasks required for artificial intelligence and public cloud services. The site spans 31 acres and has a planned total power capacity of 200 megawatts. It serves as a critical node for digital infrastructure in the Asia Pacific region, supporting the growth of hyperscale clients.

How it came about

Princeton Digital Group acquired the land for this project from JLand Group in May 2023. Construction began in October 2023, with an initial target to complete the first phase by the second quarter of 2024. The company delivered the first 52-megawatt phase within twelve months of breaking ground. In November 2026, the operator secured additional green financing to support further expansion of the campus, building on earlier funding rounds established in 2024 and 2025.

The building and the halls

The campus sits on 31 acres of land in the Sedenak Tech Park industrial zone. The design adheres to green building standards, having achieved Green Building Index Gold certification for its design phase and LEED Gold for operations. The rooftops are equipped with solar panels to generate renewable energy on-site. The infrastructure is built to support high-density rack configurations typical of modern AI training facilities.

Power and cooling

The facility has a signed energy supply agreement with Tenaga Nasional Berhad, the local utility provider, covering its full capacity. To improve sustainability, the site uses rooftop solar installations. The project has attracted significant green financing, including a USD 1.3 billion package underwritten by six major banks in late 2026. This funding supports the development of energy-efficient infrastructure in line with recognized environmental standards.

What runs inside

JH1 is built primarily for hyperscale customers who require substantial computing power. Its main applications include supporting generative artificial intelligence models and large-scale cloud computing workloads. The facility allows these clients to innovate and manage data flows efficiently. By locating in Johor, it provides an alternative to nearby Singapore, which has faced constraints on new data centre developments.

The place

Johor is situated in southern Malaysia, directly across the border from Singapore. This location has become a popular choice for data centre developers due to spillover demand from the city-state. Sedenak Tech Park offers a dedicated environment for technology infrastructure. The Malaysian government has implemented policies to support the industry, creating a favourable environment for operators like Princeton Digital Group to establish large campuses.

Environment and impact

The operator states a commitment to developing local talent and engaging with communities in Johor since entering the market in 2023. The project represents a total investment of approximately USD 1.5 billion. By securing green financing and achieving environmental certifications, the developer aims to demonstrate responsible infrastructure growth. The facility contributes to the digital ecosystem of the region while adhering to sustainable building practices.

Questions people ask about JH1

Where is the JH1 data centre located?

JH1 is located in Sedenak Tech Park in the state of Johor, Malaysia. This area is in southern Malaysia, just across the border from Singapore, making it a strategic location for regional digital infrastructure.

What is the power capacity of the JH1 campus?

The campus has a planned total power capacity of 200 megawatts. The first phase, comprising 52 megawatts, was completed and delivered within twelve months of construction starting in late 2023.

Who operates and owns the JH1 facility?

Princeton Digital Group (PDG) both owns and operates the JH1 campus. PDG is a leading data centre developer in the Asia Pacific region, backed by investors such as Warburg Pincus and Mubadala.

What type of workloads does JH1 support?

The facility is designed to support high-density workloads, specifically for artificial intelligence and cloud computing. It serves hyperscale clients who require significant computing power for generative AI and data processing.

Good reading and sources

    Where this page comes from

    There is no English Wikipedia article on JH1 yet, so the facts on this page come from the sources listed above: princetondg.com/press-releases/pdg-secures-usd-1-3-billion-for-jh1-cam, datacenterdynamics.com/en/news/pdg-delivers-first-phase-of-johor-data-. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.

    It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.

    The weekly digest

    Every Monday: the data centre of the day, new pages on EveryDatacenter, and the conferences and anniversaries of the week ahead.