STT GDC Chennai campus
Colocation data centre campus in Chennai with 68 MW capacity
STT GDC operates a multi-facility data centre campus in Chennai, India, providing colocation services since 2005. The site includes several buildings with a combined IT load of 68 MW, serving cloud providers and enterprises with sustainable, certified infrastructure.
- Total IT load capacity of 68 MW across Chennai facilities
- STTGDC CHN2 is LEED Gold certified and TIA-942 Rated 3
- Over 60% of Ambattur campus power is from green sources
- STTGDC CHN7 is a carrier-neutral, AI-ready facility
- All operational Indian data centres are ISO 45001 certified
What it is
The STT GDC Chennai campus is a collection of colocation data centres operated by STT GDC in Chennai, India. Serving clients since 2005, the campus delivers secure and scalable infrastructure with a total IT load capacity of 68 MW. The facilities are designed for resilience and energy efficiency, holding certifications such as TIA-942 Rated 3 and LEED Gold. The operator provides round-the-clock support and flexible commercial terms to meet diverse business needs.
How it came about
STT GDC has provided colocation services in Chennai since 2005. The campus has expanded over time to include multiple facilities. STTGDC CHN2 in Ambattur was developed as a large-scale production environment. More recently, the company launched STTGDC CHN7 in Siruseri and announced the development of STTGDC CHN4 in Ambattur. In June 2023, all operational data centres in India achieved ISO 45001 certification for occupational health and safety.
The building and the halls
The campus comprises several distinct facilities. STTGDC CHN1 in VSB covers 80,000 square feet. The larger STTGDC CHN2 in Ambattur is LEED Gold certified. STTGDC CHN7 is located in SIPCOT IT Park, Siruseri. Security measures include biometric access, fire suppression systems, and a six-layered physical security protocol at CHN2. The facilities are built with high-power density capabilities, supporting up to 12 kW per rack without supplemental cooling.
Power and cooling
The campus has a total IT load capacity of 68 MW. STTGDC CHN1 offers 2.5 MW, while CHN2 provides 25.5 MW. Chennai 3 adds 15 MW, and CHN7 contributes 7.2 MW. STTGDC CHN4 is under development with a planned 18 MW capacity. Over 60 percent of the Ambattur campus power comes from green sources, including 250 kW of onsite solar generation and the remainder via open access. CHN7 uses dual utility sources and N+2 diesel generators.
What runs inside
The data centres serve cloud players, enterprises, and content providers. Key partners include Yahoo India, Tata Communications, and Kyndryl. STTGDC CHN7 is described as AI-ready and carrier-neutral, offering a 99.982 percent availability service level agreement. The facilities support mission-critical systems and digital transformation initiatives for global companies. Services include colocation, connectivity, and business support.
The place
The facilities are located in Chennai, with specific sites in Ambattur and Siruseri. The Ambattur location houses the largest production facility in the campus. Siruseri is home to the newer CHN7 facility within the SIPCOT IT Park. These locations were chosen to support the rising demand for digital infrastructure in the region. The campus leverages local expertise alongside global operational standards.
Environment and impact
STT GDC emphasizes sustainability through its Environmental, Social and Governance reports. The Ambattur campus uses significant green power. All operational centres in India are ISO 45001 certified, reflecting a focus on safety and ethics. The company claims to drive sustainable innovation and resilience in the digital landscape. No specific local disputes regarding water or noise are detailed in the provided material.
Network and links
STTGDC CHN7 is explicitly described as a carrier-neutral data centre. This allows various network providers to interconnect within the facility. The campus supports connectivity requirements for industries and businesses. Tata Communications, a global digital ecosystem enabler, is listed as a strategic infrastructure partner, suggesting robust network integration capabilities.
Questions people ask about STT GDC Chennai campus
What is the total power capacity of the STT GDC Chennai campus?
The campus has a total IT load capacity of 68 MW. This includes 2.5 MW at CHN1, 25.5 MW at CHN2, 15 MW at Chennai 3, and 7.2 MW at CHN7, with an additional 18 MW planned for CHN4.
Is the STT GDC Chennai campus environmentally certified?
Yes. STTGDC CHN2 is LEED Gold certified. Additionally, all operational STT GDC data centres in India achieved ISO 45001 certification for occupational health and safety in June 2023.
Who are some of the major tenants or partners at this campus?
Strategic partners and tenants include Yahoo India Pvt Ltd, Tata Communications, and Kyndryl. The facilities serve some of the world鈥檚 leading cloud players and support mission-critical enterprise environments.
What cooling systems are used at the Chennai facilities?
STTGDC CHN2 employs a comprehensive CRAC cooling system with 2.7 million litres of water storage. STTGDC CHN7 uses air-cooled chillers with N+1 redundancy. High-density racks up to 12 kW operate without supplemental cooling.
Good reading and sources
There is no English Wikipedia article on STT GDC Chennai campus yet, so the facts on this page come from the sources listed above: sttgdc.com/in-en/locations/chennai, datacenterdynamics.com/en/news/stt-gdc-india-launches-data-center-in-c. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.
It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.