Teraco JB1 is a vendor-neutral colocation data centre in Isando, Johannesburg. It forms part of Africa’s largest interconnection hub, offering white space and utility areas for cloud, content and network providers.
- 9 000 sqm of white space in Isando
- 16 MVA total power capacity for campus
- Hosts NAPAfrica internet exchange
- Dynamic Free Cooling system used
- 40 hours diesel backup at max load
What it is
Teraco JB1 is a vendor-neutral colocation facility located in Isando, east of Johannesburg. It serves as a key node in Africa’s digital infrastructure, hosting local and international cloud, content and network providers. The site offers substantial white space for server racks and extensive utility areas to support operations. As part of the larger Isando campus, it provides clients with access to major internet exchanges and low-latency connections to public cloud platforms.
How it came about
The facility was initially launched seven years prior to the 2016 expansion announcement, placing its opening around 2009. Teraco described the subsequent build as a milestone for the African data centre industry, aiming to meet modern international standards. The expansion added significant white space and utility capacity to the existing footprint. This growth responded to rising demand from managed service providers and global entities entering the African market.
The building and the halls
The expanded facility comprises 9 000 square metres of white space and 18 500 square metres of utility space. The design focuses on achieving international standards for build and operation. Security and uptime are supported by independent water supply systems. The site allows for the storage of 210 000 litres of diesel, enabling operations at maximum load for at least 40 hours without external grid reliance.
Power and cooling
The campus negotiates power feeds directly with the local council, securing a total of 16 MVA for the Isando facilities. This capacity supports both IT loads and cooling systems. To improve efficiency, the site uses a Dynamic Free Cooling system designed to lower the Power Usage Effectiveness rating. Diesel generators provide backup power, ensuring continuity during grid outages.
What runs inside
Clients include cloud providers, content distributors, network operators and managed IT service providers. The facility hosts NAPAfrica, the continent’s largest internet exchange point. Users benefit from direct private connections to leading cloud platforms and low-latency interconnection with over 200 telecommunications providers. This setup supports enterprise cloud adoption and regional digital community growth.
The place
Situated in Isando, within the Ekurhuleni municipality east of Johannesburg, the site benefits from proximity to major transport and fibre routes. The location supports Teraco’s role as a central interconnection hub for South Africa and the broader continent. The area has seen increased investment in digital infrastructure to meet growing regional demand for data capacity.
Environment and impact
The facility underwent an Environmental Impact Assessment before receiving permission for large-scale diesel storage. Teraco states that its cooling technologies aim for high energy efficiency. The expansion reflects a commitment to investing in South Africa’s digital infrastructure, supporting government investment drives and creating capacity for local and international tech sectors.
Network and links
The site connects directly to NAPAfrica, facilitating peering among hundreds of networks. It offers low-latency links to public cloud on-ramps and private connections to major global cloud providers. This interconnection ecosystem allows enterprises and service providers to exchange traffic efficiently within the African digital landscape.
Questions people ask about Teraco JB1
Where is Teraco JB1 located?
Teraco JB1 is situated in Isando, a district east of Johannesburg in South Africa. It is part of the larger Isando campus operated by Teraco.
What type of cooling does the facility use?
The data centre employs a Dynamic Free Cooling system. This approach uses external air conditions to reduce mechanical cooling needs, aiming for a low Power Usage Effectiveness rating.
How much backup power is available on site?
The facility is permitted to store 210 000 litres of diesel. This supply allows the data centre to run at maximum load for a minimum of 40 hours during power outages.
Who are the main tenants of JB1?
Tenants include cloud providers, content delivery networks, telecommunications companies and managed IT service providers. It also hosts NAPAfrica, the largest internet exchange in Africa.
Good reading and sources
There is no English Wikipedia article on Teraco JB1 yet, so the facts on this page come from the sources listed above: teraco.co.za/news/building-africas-biggest-data-centre-in-isando/, datacenterdynamics.com/en/news/teraco-completes-jb3-data-center-on-isa. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.