Vantage Frontier
A 1.4GW AI data centre campus in Texas by Vantage.
Vantage Data Centers is building the Frontier campus in Shackelford County, Texas. This $25 billion project will deliver 1.4 gigawatts of power across ten buildings to support artificial intelligence workloads. Construction began in 2025, with the first phase due in late 2026.
- Total power capacity of 1.4 gigawatts
- Investment of over $25 billion
- Ten data centres on 1,200 acres
- Uses liquid cooling for AI workloads
- First building delivery in late 2026
What it is
Vantage Frontier is a massive data centre campus under development in Shackelford County, Texas. Operated by Vantage Data Centers, it represents the company's largest single investment. The site spans 1,200 acres and will house ten separate data centre buildings. With a total power capacity of 1.4 gigawatts, the facility is designed specifically to handle the high energy demands of artificial intelligence computing. It aims to support ultra-high-density racks exceeding 250 kilowatts each.
How it came about
Vantage Data Centers announced the Frontier project in August 2025. The company described it as a response to growing global demand for AI infrastructure. Construction on the campus started shortly after the announcement. The developer scheduled the delivery of the first building for the second half of 2026. Local officials, including the Shackelford County judge, welcomed the project as a significant economic opportunity for the region.
The building and the halls
The campus covers 1,200 acres of land in rural Texas. It will consist of ten data centre structures with a combined floor area of 3.7 million square feet. The design focuses on supporting next-generation graphics processing units (GPUs) used in AI training. To manage the heat generated by these powerful chips, the buildings will use liquid cooling technology. The company is also seeking Leadership in Energy and Environmental Design (LEED) certification for the site.
Power and cooling
Frontier has a planned total power capacity of 1.4 gigawatts. This substantial energy supply is intended to fuel intensive AI workloads. The cooling strategy relies on a highly efficient closed-loop chiller system. Vantage states this method requires minimal water, saving billions of gallons annually compared to traditional systems. The facility uses liquid cooling to directly manage heat from high-density server racks.
What runs inside
The primary purpose of the Frontier campus is to serve artificial intelligence and cloud computing providers. It is built to accommodate ultra-high-density computing racks. These racks can draw more than 250 kilowatts of power each, which is far higher than standard enterprise servers. The infrastructure supports the specific needs of GPU-heavy applications, such as large language model training and inference tasks.
The place
Shackelford County in Texas was chosen for its strategic position in the AI market. Local leaders view the project as a major driver for economic growth. The county judge noted the alignment between the name Frontier and the local history. The project promises to create over 5,000 jobs during construction and ongoing operations. Vantage has pledged to hire locally and provide training opportunities for residents.
Environment and impact
Vantage claims the campus will bring revenue to local and state economies. The company has committed to financial contributions for local charities. It also plans to offer annual college scholarships for students in Shackelford County throughout the project's life. The developer emphasizes a sustainable approach, aiming to preserve community resources through efficient water usage in its cooling systems.
Questions people ask about Vantage Frontier
Where is the Vantage Frontier campus located?
The campus is located in Shackelford County, Texas, in the United States. It sits on a 1,200-acre site designated for hyperscale data centre development.
What is the power capacity of the Frontier campus?
The entire campus is designed to have a total power capacity of 1.4 gigawatts. This energy is distributed across ten buildings to support high-density AI computing loads.
When will the Vantage Frontier campus open?
Construction has already begun. The first building on the campus is scheduled for delivery in the second half of 2026. Further phases will follow.
How does the campus handle cooling for AI servers?
It uses liquid cooling technology to manage heat from high-power GPUs. A closed-loop chiller system minimizes water usage, which the company says saves billions of gallons annually.
Good reading and sources
There is no English Wikipedia article on Vantage Frontier yet, so the facts on this page come from the sources listed above: datacenterdynamics.com/en/news/vantage-plots-14gw-data-center-campus-i, finance.yahoo.com/news/vantage-data-centers-unveils-plans-110000447.ht. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.
It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.