Compass Datacenters operates a large data centre campus in Red Oak, Texas. The site features ten buildings with a total capacity of 400 megawatts, supported by dedicated grid infrastructure. It uses air cooling systems to avoid drawing from local water supplies.

Share on WhatsApp

  • Ten buildings with 400 MW total capacity
  • Uses air cooling with zero city water draw
  • Dedicated on-site substation funded by operator
  • Over $277 million in community investments
  • Located on 225 acres in Red Oak, Texas

What it is

The Compass Red Oak campus is a data centre facility located in Ellis County, Texas. Operated by Compass Datacenters, the site consists of ten buildings with a combined power capacity of 400 megawatts. It serves as critical infrastructure for digital services, hosting servers that store data for businesses and individuals. The campus is designed to be secure and reliable, supporting modern computing needs without relying on local water resources for cooling.

How it came about

Compass Datacenters began its involvement in the Red Oak community in 2019. The company initially purchased 165 acres with plans for sixteen buildings. In 2020, the land holding expanded to 225 acres to support up to 350 megawatts of capacity. Further acquisitions in April 2023 added 375 acres of undeveloped land. Recent filings indicate an expansion with three new buildings, with construction costs estimated at 300 million dollars. Completion of these additional structures is expected between 2025 and 2026.

The building and the halls

The campus occupies a substantial land area in Red Oak. Most of the site is zoned for data centre use, though the developer chose to rezone parts of it. This decision allowed for greater setbacks, berms, and landscaping to screen the buildings from the road and nearby homes. The design includes reflective roofing to lower ambient temperatures. Security and noise management are integrated into the layout, with sound-dampening features ensuring compliance with local ordinances at the campus boundary.

Power and cooling

The facility is served by a dedicated on-site substation fully funded by Compass Datacenters. A planned switching station connects to the existing 138 kV transmission line, built in partnership with Oncor. The company states it has invested significantly in grid infrastructure upgrades to ensure reliability. Power is drawn from the grid, but the operator claims to help stabilise the network during high-stress events. Emergency backup generators use clean-burning HVO biofuel.

What runs inside

This campus supports a wide range of digital activities, from banking records to cloud computing services. While specific tenants are not listed, the infrastructure is built to Class A standards suitable for hyperscale and enterprise clients. The site contributes to the broader digital economy by providing secure space for servers. It also serves as a hub for workforce development, offering training pathways for local residents to enter the data centre industry.

The place

Red Oak, located in Ellis County, Texas, was chosen for its available land and proximity to power infrastructure. The developer emphasizes a community-first approach, engaging with local leaders and residents. Investments include funding for schools, parks, and an animal shelter. The company holds regular open houses to answer questions from neighbours. These efforts aim to integrate the facility into the local fabric while minimizing disruption.

Environment and impact

Compass Datacenters claims the campus uses zero city water for cooling, relying instead on air cooling and closed-loop systems. This approach avoids drawing from local aquifers or reservoirs. The operator states that annual water usage is comparable to two average households. Noise levels are managed to meet or fall below local limits. The company reports creating thousands of long-term jobs, with wages above the local average. Community investments total more than 277 million dollars across all projects.

Network and links

The campus connects to the regional power grid through a dedicated substation and transmission lines. It is situated near other major technology developments in the Dallas-Fort Worth area. The infrastructure supports high-speed data transfer required for modern internet services. Partnerships with utility providers ensure robust connectivity and power delivery. The site is part of a larger network of facilities operated by Compass Datacenters.

Questions people ask about Compass Red Oak campus

How much power does the Red Oak campus use?

The campus has a total power capacity of 400 megawatts. It is served by a dedicated on-site substation and connects to the local transmission grid through a partnership with Oncor.

Does the data centre use local water for cooling?

No. The operator states that the facility uses zero city water for cooling. It relies on air cooling and closed-loop systems that recycle water, resulting in minimal annual usage.

When was the Red Oak campus established?

Compass Datacenters began its partnership with the Red Oak community in 2019. The company acquired land that year and has since expanded its holdings and building plans.

What community benefits has the project provided?

The operator has invested in local schools, an animal shelter, and workforce training programs. Total community investments across all projects exceed 277 million dollars, independent of tax incentives.

Good reading and sources

    Where this page comes from

    There is no English Wikipedia article on Compass Red Oak campus yet, so the facts on this page come from the sources listed above: compassdatacenters.com/red-oak-oglesby-road-campus/, datacenterdynamics.com/en/news/compass-datacenters-looks-to-expand-red. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.

    It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.

    The weekly digest

    Every Monday: the data centre of the day, new pages on EveryDatacenter, and the conferences and anniversaries of the week ahead.