CtrlS Navi Mumbai campus
Hyperscale data centre campus in Navi Mumbai with renewable power.
CtrlS operates a large hyperscale data centre campus in Navi Mumbai, India. The site currently holds five buildings with 116 MW of power capacity and plans to expand to thirteen buildings totalling 700 MW. It uses significant renewable energy from a dedicated solar farm.
- Planned total capacity of 700 MW across 13 buildings
- Powered by 125 MW captive solar farm in Nagpur
- Rated-4 facility with nine-layer security protocol
- Asia鈥檚 largest Gas Insulated Substation on site
- Designed to accommodate liquid cooling for AI workloads
What it is
The CtrlS Navi Mumbai campus is a major hyperscale data centre facility located in Navi Mumbai, India. Operated by CtrlS Datacenters, the site currently comprises five operational buildings with a combined power capacity of 116 megawatts. The company describes it as the largest data centre campus in Mumbai. It is designed to support high-density workloads, including artificial intelligence applications, through infrastructure that accommodates liquid cooling racks. The campus aims to provide scalable colocation services for enterprise and cloud clients.
How it came about
CtrlS has developed the campus in phases, with five buildings currently active and six more planned for future expansion. The total planned capacity for the thirteen-building site is 700 megawatts across three million square feet. In June 2024, the first phase of the GreenVolt 1 solar farm went live, followed by the completion of the second phase later that year. This energy project supports the campus鈥檚 growth strategy. The developer has outlined a broader investment plan to expand its footprint across Asia and the Middle East.
The building and the halls
The campus features five existing data centre buildings with a total area of approximately 394,177 square feet for the initial phases, expanding to a planned three million square feet. The facilities are rated as Rated-4 centres, indicating high availability and redundancy. Security is structured in nine zones, ranging from controlled gates and crash barriers at the perimeter to biometric access in inner zones. The design includes fire-rated doors, gas suppression systems, and decentralised monitoring. The site is situated away from malls and high-profile buildings to enhance security and operational stability.
Power and cooling
Power supply is a key focus, with a current capacity of 116 megawatts scaling to 700 megawatts. The campus connects to Asia鈥檚 largest Gas Insulated Substation, which has a capacity of 300 megawatts and can scale to 700 megawatts. To support sustainability, CtrlS completed a 125-megawatt captive solar farm in Nagpur, known as GreenVolt 1. This facility uses N-type solar panels for higher efficiency and is expected to cover 60 percent of the campus's energy consumption. The company aims for carbon neutrality by 2040 and plans to build over one gigawatt of solar capacity by 2030.
What runs inside
The campus serves a mix of enterprise, cloud, and artificial intelligence workloads. It is designed to be AI-optimised, with infrastructure ready for liquid cooling racks that handle demanding computational tasks. Major tenants include Reliance Power, United Overseas Bank, and Protean eGov Technologies. The facility offers carrier-neutral connectivity, allowing customers to choose from various network providers. Services range from dedicated rack space to custom-built solutions and private cloud architectures, supporting digital transformation and business continuity for its clients.
The place
Located in Navi Mumbai, the campus benefits from strategic connectivity. It lies 33 kilometres from Mumbai International Airport and 19 kilometres from the upcoming Navi Mumbai Airport. The site is 24 kilometres from the Expressway and 35 kilometres from Mumbai Central railway station. Mumbai itself hosts nine cable landing stations, positioning it as a hub for global connectivity. The suburban location provides distance from dense urban centres while maintaining access to major transport routes and fibre networks.
Environment and impact
The operator emphasises environmental responsibility through its use of renewable energy and advanced water recycling systems. The GreenVolt 1 solar project is intended to reduce the carbon footprint of operations significantly. By using N-type solar panels and planning for complete carbon neutrality by 2040, the company aims to set industry benchmarks for sustainability. The campus also contributes to local infrastructure through its large-scale power substation and commitment to green power sources.
Network and links
Connectivity is supported by Mumbai鈥檚 status as a major internet hub with nine cable landing stations. The campus offers carrier-neutral interconnectivity with diversified fibre entrance paths. It provides access to multiple internet exchanges and cloud service providers. This setup ensures redundant and seamless data flow for tenants. The strategic location near major transport and communication arteries facilitates robust network performance and low-latency connections for regional and global traffic.
Questions people ask about CtrlS Navi Mumbai campus
What is the total power capacity of the CtrlS Navi Mumbai campus?
The campus currently has a combined power capacity of 116 megawatts across five buildings. The full development plan includes thirteen buildings with a total capacity of 700 megawatts.
How does the campus source its energy?
The facility uses grid power and renewable energy from a 125-megawatt captive solar farm in Nagpur. This solar project covers about 60 percent of the campus's energy needs.
Is the data centre suitable for AI applications?
Yes, the infrastructure is engineered to accommodate liquid cooling racks. This design optimises performance and energy efficiency for the high-density workloads typical of AI applications.
What security measures are in place at the campus?
The site employs a nine-zone security protocol. This includes controlled gates, crash barriers, under-vehicle scanning, metal detectors, and biometric access controls in the most sensitive areas.
Good reading and sources
There is no English Wikipedia article on CtrlS Navi Mumbai campus yet, so the facts on this page come from the sources listed above: ctrls.com/datacenter-mumbai/, datacenterdynamics.com/en/news/ctrls-completes-125mw-solar-farm-to-pow. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.
It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.