News
EveryDatacenter
CtrlS Noida campus

CtrlS Noida campus

Hyperscale data centre in Noida with solar power and liquid cooling.

CtrlS operates a hyperscale data centre in Noida, India, designed for high-density AI workloads. The facility uses renewable energy and advanced cooling to support digital transformation in North India.

Share on WhatsApp

  • 8 MW IT capacity in Noida
  • 60% energy from solar power
  • Rated-4 tier certification
  • Seismic zone 5 compliant
  • Liquid cooling for AI workloads

What it is

The CtrlS Noida campus is a hyperscale data centre located in Noida, India. It is operated by CtrlS Datacenters and serves enterprises in North India. The facility is rated-4 and built to withstand seismic activity. It supports cloud, AI, and enterprise workloads with high reliability and performance.

How it came about

CtrlS founded SunSource Energy partnership to supply solar power. The company aims for net zero emissions by 2030. This site is part of a broader expansion including facilities in Mumbai, Bangalore, and Kolkata. Plans for new sites in Uttarakhand, Gujarat, and Thailand are also underway.

The building and the halls

The building covers 9,500 square metres. It complies with seismic zone 5 standards, resisting earthquakes above magnitude 8. Security includes nine layers, from fortified walls to biometric access. Fire suppression uses pre-action sprinklers and gas systems. The design allows for custom build-to-suit configurations.

Power and cooling

The facility has an IT capacity of 8 megawatts. Sixty percent of its energy comes from solar power via SunSource Energy. The solar plant is in Jhansi district. CtrlS provides renewable energy credits to clients. Water recycling systems help reduce resource use. Direct-to-chip cooling cuts energy consumption.

What runs inside

Tenants include Reliance Power, United Overseas Bank, and Protean eGov Technologies. The centre offers carrier-neutral connectivity and access to multiple internet exchanges. It supports private cloud architectures and disaster recovery services. Clients benefit from redundant interconnectivity and diverse fibre paths.

The place

Noida is 36 kilometres from Delhi International Airport. The site has no flood history for 100 years. It is accessible by all transport modes. The location supports digital transformation for regional businesses. Proximity to Delhi enhances connectivity and logistics for enterprises.

Environment and impact

The solar partnership offsets 94,640 tons of CO2 over its lifetime. This equals planting nearly 190,000 trees. CtrlS commits to green power and water recycling. The company aims for net zero by 2030. These efforts reduce the carbon footprint of digital operations in India.

Network and links

The data centre is carrier-neutral. It connects to multiple internet exchanges and service providers. Fibre entrance paths are diversified for redundancy. Clients can choose from various connectivity options. This setup ensures seamless data flow and robust network performance.

Questions people ask about CtrlS Noida campus

What is the power capacity of the Noida data centre?

The facility has an IT load capacity of 8 megawatts. It is designed to support high-density workloads typical of AI and cloud computing applications.

How much renewable energy does the site use?

Sixty percent of the yearly energy requirements are met through solar power. This is supplied by a solar farm in Jhansi district via a partnership with SunSource Energy.

Is the building safe from earthquakes?

Yes, it is built to comply with seismic zone 5 standards. The structure can withstand earthquakes measuring 8 or above on the Richter scale, ensuring safety against natural calamities.

Who are some of the tenants at this facility?

Major tenants include Reliance Power, United Overseas Bank, and Protean eGov Technologies. These organisations use the site for their critical IT infrastructure and digital needs.

Good reading and sources

    Where this page comes from

    There is no English Wikipedia article on CtrlS Noida campus yet, so the facts on this page come from the sources listed above: ctrls.com/datacenter-noida/, datacenterdynamics.com/en/news/ctrls-8mw-data-center-in-noida-adopts-s. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.

    It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.

    The weekly digest

    Every Monday: the data centre of the day, new pages on EveryDatacenter, and the conferences and anniversaries of the week ahead.