MERLIN Edged

MERLIN Edged

Sustainable data centre operator in the Iberian Peninsula

MERLIN Edged is a joint venture between MERLIN Properties and Edged Energy that builds and operates carbon neutral data centres in Spain and Portugal. The partnership focuses on high efficiency infrastructure for artificial intelligence and cloud computing, using renewable energy and waterless cooling systems.

Share on WhatsApp

  • Partnership formed in 2020 between MERLIN and Edged
  • Barcelona site hosts 10,224 NVIDIA H200 GPUs
  • Zero water consumption for cooling systems
  • Target PUE of 1.15 across portfolio
  • Powered entirely by renewable electricity

What it is

MERLIN Edged operates a network of data centres across the Iberian Peninsula, specifically in Spain and Portugal. The company is a partnership between real estate firm MERLIN Properties and technology developer Edged Energy, established in 2020. It specialises in building sustainable facilities for hyperscale and artificial intelligence workloads. The infrastructure supports high density computing with advanced cooling technologies while maintaining a carbon neutral footprint through renewable energy usage.

How it came about

MERLIN Properties and Edged Energy joined forces in 2020 to promote and build digital infrastructure in the region. The Barcelona facility was inaugurated in May 2025 by the city mayor. This site hosts a major supercomputer for CoreWeave. The company has expanded its portfolio to include locations in Madrid, Bilbao, and Lisbon, with further projects planned for Extremadura and Tres Cantos.

The building and the halls

Facilities are designed to Tier III standards with N plus one redundancy for power and cooling. The Barcelona campus sits at the PLZF location, while Madrid sites are in Getafe. Bilbao operations are based at the Arasur industrial hub. The designs support rack densities up to 120 kilowatts with air cooling and over 400 kilowatts with liquid integration. An integrated platform monitors mechanical and power systems in real time.

Power and cooling

The data centres operate exclusively on electricity from renewable sources. They are designed to be carbon neutral and consume zero water for cooling purposes. The portfolio aims for a Power Usage Effectiveness of 1.15, which is lower than European and global averages. Planned microgrid capabilities and onsite battery storage are part of the energy strategy. Solar development contracts in Spain support these carbon neutral operations.

What runs inside

CoreWeave uses the Barcelona site to host NVIDIA Hopper GPUs for AI training and inference. The facility supports thousands of graphics processing units with InfiniBand connectivity. Plans include extending capacity with Blackwell supercomputers. The infrastructure serves cloud companies and AI labs requiring accelerated computing. It acts as a gateway for global markets via subsea cable connections.

The place

The Iberian Peninsula is chosen for its dense fibre network and abundant renewable energy. Barcelona is positioned as a digital port in the Mediterranean with strong startup activity. Madrid serves as a central fibre and logistics hub. Bilbao offers low latency links between Europe and North America. Lisbon benefits from converging undersea cable networks and a growing digital economy.

Environment and impact

The company claims its facilities are carbon and water neutral. It emphasizes high efficiency in converting electrical power into computing capacity. Local governments in Barcelona and Catalonia support the initiatives as drivers of technological innovation and economic growth. The infrastructure aims to attract international players in the artificial intelligence field to the region.

Network and links

Sites connect to major subsea cables including those landing in Bilbao, Barcelona, and Lisbon. The Barcelona facility links to the Barcelona Cable Landing Station. This provides access to fast global routes across Europe and North America. The network leverages regional fibre density to ensure low latency for high demand compute solutions.

Questions people ask about MERLIN Edged

Who owns and operates MERLIN Edged?

It is a joint venture between MERLIN Properties, a real estate company, and Edged Energy, a technology developer. They partnered in 2020 to build and operate data centres in Spain and Portugal.

What makes these data centres sustainable?

They use 100 percent renewable electricity and waterless cooling systems. The design targets a Power Usage Effectiveness of 1.15 and aims for carbon neutral operations through solar contracts and efficiency.

Which major tenant uses the Barcelona facility?

CoreWeave hosts a large scale AI supercomputer there. The site contains thousands of NVIDIA H200 GPUs for training and inference, with plans to add Blackwell systems in 2026.

Where are the data centres located?

Operating sites include Barcelona, Madrid-Getafe, and Bilbao-Arasur in Spain. The pipeline includes projects in Lisbon, Madrid-Tres Cantos, and Extremadura, covering key hubs in the Iberian Peninsula.

Good reading and sources

    Where this page comes from

    There is no English Wikipedia article on MERLIN Edged yet, so the facts on this page come from the sources listed above: edged.es/, finance.yahoo.com/news/mayor-barcelona-jaume-collboni-inaugurates-1100. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.

    It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.

    Photo credits on this page

    The small pictures above come from Wikimedia Commons under free licences. Some are cropped to fit.

    The weekly digest

    Every Monday: the data centre of the day, new pages on EveryDatacenter, and the conferences and anniversaries of the week ahead.