Polaris Forge 1 is a data centre campus in Ellendale, North Dakota, operated by Applied Digital. It provides high-density computing power for artificial intelligence workloads, with CoreWeave as its sole tenant. The site reached 250 megawatts of capacity in late 2025.
- Located in Ellendale, North Dakota
- Fully leased to CoreWeave for AI workloads
- Total planned capacity of 400 megawatts
- Uses proprietary waterless cooling technology
- Construction started in September 2022
What it is
Polaris Forge 1 is a large-scale data centre campus located in Ellendale, North Dakota. It is part of the Applied AI Factories portfolio developed by Applied Digital Corporation. The facility is designed to support high-density workloads for artificial intelligence training and inference. CoreWeave leases the entire site, using it for cloud computing services. The campus uses proprietary waterless cooling systems to manage heat from powerful graphics processing units. Applied Digital describes the site as purpose-built infrastructure that converts electrical power into operational compute capacity.
How it came about
Construction on Polaris Forge 1 began in September 2022. Initially, the project was intended for cryptocurrency mining and high-performance computing tasks. As market demands shifted, Applied Digital pivoted the site to focus exclusively on artificial intelligence infrastructure. The first phase of Building 1 became operational in December 2025. Building 2 followed, with its first phase going live in July 2026. The second phase of Building 2 added 75 megawatts of critical load, bringing the total active capacity to 250 megawatts. The company states the site is fully leased to CoreWeave.
The building and the halls
The campus consists of multiple buildings designed for repeatable deployment. Building 2 contains three data halls, each capable of supporting 25 megawatts of critical IT load. The design prioritises disciplined execution and long-term performance. Applied Digital claims the infrastructure is built to last for decades and adapt to evolving hardware requirements. The site is located in a rural area, allowing for large-scale physical expansion. The buildings house high-density compute environments suitable for hyperscale customers.
Power and cooling
Polaris Forge 1 is connected to the utility grid. At full build-out, the campus will deliver 400 megawatts of IT capacity. The current operational capacity stands at 250 megawatts following the completion of Building 2. Applied Digital notes that securing power is only the initial step, with the real challenge being the conversion of that power into usable capacity. The site relies on grid-connected utility power rather than on-site generation. The company manages the transmission and substation needs required to support such high loads.
What runs inside
CoreWeave is the sole tenant of Polaris Forge 1. The facility supports artificial intelligence training and inference workloads. These tasks require significant computational power and efficient cooling. The site is part of Applied Digital鈥檚 broader strategy to provide infrastructure for hyperscalers and emerging technologies. By leasing the entire campus, CoreWeave secures dedicated resources for its cloud services. The infrastructure is optimised for high-density graphics processing units used in machine learning models.
The place
Ellendale, North Dakota, provides a rural setting for the data centre. This location offers access to land and grid infrastructure necessary for large-scale projects. North Dakota has become a hub for digital infrastructure due to available power and cooler climates. Applied Digital also operates other sites in the state, including cryptomining facilities in Jamestown and Ellendale. The choice of location supports the company鈥檚 goal of building scalable infrastructure outside congested urban centres.
Environment and impact
Applied Digital highlights its community impact through local grant programmes. The shift from cryptocurrency mining to AI infrastructure reflects broader industry trends. The company employs a long-term ownership mindset, aiming to create lasting economic value. The project contributes to the regional development of high-tech industries in North Dakota.
Network and links
The facility is designed for hyperscale customers who typically bring their own network connectivity. As a dedicated AI campus, the primary focus is on internal compute density rather than public peering. Connectivity is managed to support the high-speed data transfer required for AI training clusters.
Questions people ask about Polaris Forge 1
Who operates Polaris Forge 1?
Applied Digital Corporation designs, builds, and operates the Polaris Forge 1 campus. The company is headquartered in Dallas, Texas, and focuses on large-scale digital infrastructure for hyperscalers and enterprises.
What is the power capacity of the site?
The campus has a planned total IT capacity of 400 megawatts. As of late 2025, 250 megawatts were operational following the completion of Building 2. The site connects to grid-connected utility power.
Who is the main tenant of the data centre?
CoreWeave leases the entire Polaris Forge 1 campus. The company uses the infrastructure for artificial intelligence training and inference, requiring high-density compute resources provided by the facility.
When did construction begin?
Construction on Polaris Forge 1 started in September 2022. The first phase of Building 1 was completed in December 2025, and the second phase of Building 2 went live in July 2026.
Good reading and sources
There is no English Wikipedia article on Polaris Forge 1 yet, so the facts on this page come from the sources listed above: applieddigital.com/, datacenterdynamics.com/en/news/applied-digital-adds-75mw-of-capacity-a. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.