AtNorth DEN01

AtNorth DEN01

Liquid-cooled AI data centre in Ballerup, Denmark

atNorth DEN01 is a 30 MW liquid-cooled data centre in Ballerup, near Copenhagen. It opened in late 2025 to support high-density GPU workloads for clients like CoreWeave, while reusing waste heat for local district heating.

Share on WhatsApp

  • Total capacity of 30 MW across 27,730 sqm
  • Supports rack densities up to 100 kW
  • Supplies waste heat to local district heating
  • CoreWeave leases 22.5 MW of IT capacity
  • First phase went live in Q4 2025

What it is

atNorth DEN01 is a data centre facility located in Ballerup, within the greater Copenhagen area of Denmark. Operated by atNorth, the site provides 30 megawatts of power capacity across a floor area of 27,730 square metres. The facility is designed specifically for high-performance computing tasks, such as artificial intelligence training, which require dense power usage. It supports rack densities of up to 100 kilowatts per unit. The centre uses direct liquid cooling to manage the heat generated by these intensive workloads. Its primary purpose is to host cloud infrastructure for clients needing significant graphical processing unit resources.

How it came about

The project was announced in 2023. Construction proceeded rapidly, with the build phase lasting approximately twelve months. The first phase of the data centre became operational in the fourth quarter of 2025. This swift delivery allowed early tenants to deploy their infrastructure within a year of the project's public reveal. The facility represents atNorth鈥檚 expansion in the Nordic region, catering to the growing demand for AI-focused compute power in Europe.

The building and the halls

The site covers 27,730 square metres in Ballerup. It is engineered to handle high-density equipment, with each rack capable of supporting 100 kilowatts of power draw. This design differs from traditional facilities that typically support much lower densities. The building infrastructure integrates direct liquid cooling systems throughout. This approach removes heat more efficiently than air-based methods, allowing for tighter packing of servers. The layout supports the specific thermal and power needs of modern graphics processing units used in machine learning.

Power and cooling

DEN01 has a total power capacity of 30 megawatts. The facility relies on renewable energy sources, secured through power purchase agreements. A key feature of its energy strategy is heat reuse. Surplus thermal energy generated by the servers is captured and supplied to the local district heating network. This process helps warm nearby homes and contributes to the local green transition. The combination of renewable electricity and heat recovery aims to reduce the overall environmental footprint of the computing operations.

What runs inside

The primary tenant identified is CoreWeave, an artificial intelligence cloud provider. CoreWeave leases 22.5 megawatts of IT capacity at the site. This deployment marks the company鈥檚 first entry into the Danish market. The infrastructure supports GPU-intensive processing required for AI model training and inference. By using this facility, CoreWeave expands its European presence, joining other locations in Sweden, Norway, Spain, and the United Kingdom. The site enables customers to run large-scale AI workloads with high energy efficiency.

The place

Located in Ballerup, part of the greater Copenhagen region, the centre benefits from proximity to urban infrastructure. The choice of location allows for integration with the local district heating system. This connection turns waste heat into a community resource. The area supports the technical requirements for high-density computing while maintaining links to sustainable energy grids. The facility serves as a node in the broader European digital infrastructure landscape.

Environment and impact

The facility contributes to the local green transition by supplying surplus heat to homes. This heat reuse agreement reduces the need for other heating sources in the area. The operator emphasizes responsible operation and energy efficiency. By using renewable power and capturing waste heat, the centre aims to lower its carbon impact. The project supports the development of renewable energy through long-term purchase agreements. Local residents benefit from the thermal output of the digital infrastructure.

Network and links

CoreWeave connects this site to its global AI network backbone. The company is expanding its network points of presence to include regions in Asia and the Middle East. The backbone uses multiple 400 gigabit-per-second connections at each node. It employs hardware-based encryption to secure data in transit. Redundant network paths ensure reliability. This connectivity allows workloads to move seamlessly between DEN01 and other facilities in North America and Europe.

Questions people ask about AtNorth DEN01

What is the power capacity of atNorth DEN01?

The facility has a total power capacity of 30 megawatts. It is designed to support high-density workloads, with individual racks capable of handling up to 100 kilowatts of power draw.

How does the data centre handle cooling?

DEN01 uses direct liquid cooling. This method is more efficient than air cooling for high-density servers. It allows the facility to manage the heat generated by powerful graphics processing units effectively.

Who is the main tenant at this facility?

CoreWeave is the primary tenant mentioned. The AI cloud firm leases 22.5 megawatts of IT capacity at the site to support its artificial intelligence computing services in Europe.

What happens to the waste heat produced?

The surplus heat generated by the servers is not wasted. It is captured and supplied to the local district heating network, helping to warm homes in the surrounding Copenhagen area.

Good reading and sources

    Where this page comes from

    There is no English Wikipedia article on AtNorth DEN01 yet, so the facts on this page come from the sources listed above: datacenterdynamics.com/en/news/coreweave-leasing-225mw-from-atnorth-da. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.

    It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.