British AI cloud company building GPU data centres in Europe and the US

Nscale is a British full-stack AI cloud business, founded in London in May 2024 by Josh Payne, that builds AI-ready data centres and GPU cloud infrastructure. It runs sites in Norway, Iceland, Portugal, the UK and the United States, with Microsoft as its main customer and NVIDIA, Nokia and Dell among its backers.

Share on WhatsApp

  • Founded in London in May 2024 by Josh Payne
  • Glomfjord site runs on 100% renewable hydropower, 30 MW
  • Narvik planned at 230 MW with over 30,000 NVIDIA Vera Rubin GPUs
  • Series C of $2 billion in March 2026 valued the company at $14.6 billion
  • Microsoft contracted for more than 200,000 NVIDIA chips

What it is

Nscale is a British company that builds and runs AI-ready data centres together with the GPU cloud that sits on top of them. It was set up in London in May 2024 by Josh Payne and employs around 1,000 people. Its work covers AI services, private AI clouds and what it calls AI factories. Sites are at different stages: some are already serving customers, others are still being built. Capacity figures quoted include 30 megawatts at Glomfjord in Norway, a 15-megawatt GPU cluster in Iceland, and 230 megawatts planned at Narvik. Microsoft is the anchor customer across several locations.

How it came about

The business grew out of Arkon Energy, a Melbourne infrastructure firm that secured power and built in places suited to heavy computing, including sites with plentiful renewable energy, and also supplied crypto-mining infrastructure. Arkon wound down, and Nscale took on a Norwegian site at Glomfjord. A $155 million Series A closed in December 2024. During 2025 the company joined government-backed sovereign AI programmes in the UK and Europe, agreed a joint venture with Aker ASA at Narvik, raised $1.1 billion in Series B, and added $433 million through a pre-Series C SAFE. A $2 billion Series C in March 2026 valued the firm at $14.6 billion.

The building and the halls

Nscale's estate mixes its own campuses with space inside other operators' facilities. In Iceland it runs a liquid-cooled GPU cluster within Verne Global's campus. In Portugal it occupies buildings at Start Campus's Sines site. In West Virginia it bought the Monarch Compute Campus at Mason County from Fidelis New Energy, a 2,250-acre plot. A hyperscale AI campus is planned in Ward County, Texas. The Narvik project in northern Norway is being developed with Aker ASA and is sized at 230 megawatts.

Power and cooling

Energy sourcing is central to the site choices. Glomfjord runs entirely on renewable hydropower and has 30 megawatts of capacity. The Icelandic cluster draws 100% renewable energy. At Monarch in West Virginia, planned supply reaches 2 gigawatts by 2028 and more than 8 gigawatts by 2031, generated on site rather than drawn from the grid, and the campus is described as the first AI microgrid certified by a US state. Cooling at the Iceland cluster is direct liquid cooling, suited to dense GPU racks.

What runs inside

Microsoft has contracted GPU capacity in Norway, Portugal, the UK and the United States, and Nscale has agreed to supply it with more than 200,000 NVIDIA chips. Around 12,600 Blackwell Ultra GPUs are being delivered from Sines, with roughly 66,000 Rubin units planned there from late 2027. Narvik is due to host over 30,000 Vera Rubin GPUs for Microsoft from 2027, and the Texas campus about 104,000 GPUs from 2026. Other partners include Singtel, Vast Data, BT and Dell.

The place

Sites were picked for power and climate rather than city access. Glomfjord and Narvik sit in northern Norway where hydropower is abundant. Sines in Portugal offers a large campus run by Start Campus. Ward County, Texas and Mason County, West Virginia give room for very large campuses. The company also works with BT at three UK locations. Head office functions remain in London.

Environment and impact

Nscale promotes renewable energy at its Nordic sites and positions itself in sovereign AI programmes backed by governments in the UK and Europe. Its West Virginia campus generates power on site through a microgrid arrangement. Reported revenue was $19.1 million in 2024, $33.0 million in 2025 and $140.6 million in the first half of 2026, with $103.4 billion in active and contracted take-or-pay agreements stated in its Form S-1.

Network and links

Nokia is building the IP network and connectivity layer for Nscale's data centres. A September 2024 agreement with Singtel extended GPU-as-a-Service reach across Europe and Southeast Asia, giving access to NVIDIA H100 chips via Singtel's Paragon platform and Nxera facilities, while Singtel gained use of Nscale's AMD and NVIDIA capacity in Europe. Vast Data supplies the data layer for the global AI cloud.

Questions people ask about Nscale

What does Nscale actually do?

It builds AI-ready data centres and the GPU cloud that runs on them, offering AI services, private AI clouds and AI factories. The company was founded in London in 2024 and works across the US, Europe and Asia.

Where are its data centres?

Sites include Glomfjord in Norway, a cluster inside Verne Global's campus in Iceland, buildings at Start Campus in Sines, Portugal, planned campuses in Ward County, Texas and Mason County, West Virginia, and work with BT at three UK locations.

Who is the main customer?

Microsoft. It has contracted GPU capacity across Nscale sites in Norway, Portugal, the UK and the US, and Nscale has agreed to supply it with over 200,000 NVIDIA chips.

How is it powered?

The Norwegian site uses 100% renewable hydropower and the Icelandic cluster runs on 100% renewable energy. The West Virginia campus is planned to generate its own electricity on site, reaching 2 GW by 2028.

How much funding has it raised?

Rounds include $155 million Series A in December 2024, $1.1 billion Series B in September 2025, $433 million in a pre-Series C SAFE, and $2 billion Series C in March 2026, valuing the company at $14.6 billion.

Good reading and sources

Where this page comes from

The facts on this page come from the Wikipedia article "Nscale", written by its contributors and used under the CC BY-SA 4.0 licence, and from its Wikidata record (CC0). EveryDatacenter rewrote the text in its own words, with AI assistance, and compares every page with the article to make sure no passage is copied. It may be reused under the same CC BY-SA 4.0 licence with a link back.

It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.

The weekly digest

Every Monday: the data centre of the day, new pages on EveryDatacenter, and the conferences and anniversaries of the week ahead.