Start Campus

Start Campus

AI-ready data centre campus in Sines, Portugal using seawater cooling.

Start Campus operates a large-scale data centre facility in Sines, Portugal, designed for high-density artificial intelligence and cloud workloads. The site uses repurposed power plant infrastructure for seawater cooling and runs on renewable energy, with Microsoft as a major tenant.

Share on WhatsApp

  • Total planned power capacity of 1.2 gigawatts.
  • Uses seawater cooling from a decommissioned power plant.
  • Microsoft invested $10 billion in the campus.
  • Powered by 100% renewable energy sources.
  • First phase went live in early 2023.

What it is

Start Campus is a developer and operator of large-scale digital infrastructure located in Sines, Portugal. The company focuses on building facilities capable of supporting high-density artificial intelligence, cloud computing, and high-performance computing tasks. Its primary asset is the SINES Data Campus, a project with a total planned power capacity of 1.2 gigawatts. The site is designed to be carrier-neutral and aims for high reliability with concurrent maintainability. The first operational building, known as SIN01, has achieved LEED Gold certification for its sustainable design. The campus serves as a gateway for connectivity between Europe and other continents.

How it came about

The project was announced with plans to develop a site adjacent to a decommissioned coal power plant. Construction began on the first phase, called Nest, which included a 15-megawatt building with six data halls. This initial phase went live in the first quarter of 2023. In late 2025, Microsoft announced a ten-billion-dollar investment in the campus. Shortly after, Start Campus partnered with Nscale to deploy NVIDIA Blackwell Ultra graphics processing units for Microsoft. The company has received several industry awards, including Best Data Centre in Europe in 2026. CEO Robert Dunn was named to the TIME100 Climate list in November 2026.

The building and the halls

The campus sits on more than 60 hectares of land within the Sines Industrial and Logistics Zone. The design repurposes infrastructure from the former power station, specifically for its cooling systems. The first building covers 5,000 square meters. The facility is certified as Open Compute Project Ready version 2 for hyperscale environments. It offers flexible deployment models, including powered shell and build-to-suit options. The structures are built to support liquid cooling technologies required for modern AI hardware. The site aims for an industry-leading power usage effectiveness ratio of 1.1.

Power and cooling

The facility is powered entirely by renewable energy sources. Start Campus has signed strategic partnerships with energy providers like EDP to secure this supply. Cooling is achieved through an innovative seawater system that eliminates the need for freshwater. This method optimises energy efficiency and supports the company’s goal of reaching net zero emissions by 2030. The total planned capacity for the campus is 1.2 gigawatts. The initial phase provided 15 megawatts, with subsequent buildings planned at 60 megawatts each. The design integrates direct liquid cooling to handle the heat generated by high-density computing racks.

What runs inside

The campus hosts infrastructure for artificial intelligence training and inference, cloud services, and high-performance computing. Microsoft is a key tenant, utilising the site for its European customers. Nscale also operates there, deploying large clusters of NVIDIA GPUs. The facility supports frontier AI capabilities and serves as a hub for global communication due to its low-latency connections. It is carrier-neutral, allowing various network providers to interconnect. The site also supports research initiatives and startups through programmes like the START Rise Challenge.

The place

Sines is located in southern Portugal and serves as a strategic digital gateway. The country connects directly to every inhabited continent via submarine cables. The site benefits from proximity to landing stations for cables such as EllaLink and Medusa. This location provides terrestrial and subsea links to 75 countries. The choice of Sines allows for the reuse of industrial land and access to natural cooling resources. The development is expected to contribute significantly to the local economy and create qualified jobs in the region.

Environment and impact

The project aims to rejuvenate former industrial properties while promoting sustainable practices. By using seawater for cooling, it avoids consuming fresh water resources. The company engages with the local community to support sustainable growth. A study suggested that data centre development could contribute billions to the national gross domestic product by 2030. Start Campus collaborates with local educational institutions like NOVA IMS to develop specialised talent. The facility has been recognised for its environmental performance, achieving LEED Gold status and aiming for net zero operations.

Network and links

The campus connects to four continents through fibre optic links. Portugal hosts 124 international cable landing stations, providing extensive global reach. The EllaLink cable already lands in Sines, offering direct links to South America. The Medusa cable system is also scheduled to land there. These connections ensure low to ultra-low latencies for worldwide communication. The facility is carrier-neutral, enabling seamless interconnection for various network operators and content providers.

Questions people ask about Start Campus

Where is the Start Campus located?

The Start Campus is located in Sines, Portugal, within the Sines Industrial and Logistics Zone. It sits on more than 60 hectares of land adjacent to a former coal power plant.

How does the data centre cool its servers?

The facility uses an innovative seawater cooling system. It repurposes infrastructure from a decommissioned power plant to draw in seawater, which eliminates the need for freshwater and improves energy efficiency.

Who are the main tenants or partners at the campus?

Microsoft is a major tenant, having announced a significant investment in the site. Nscale also operates there, deploying NVIDIA GPU infrastructure. The campus is carrier-neutral, allowing many network providers to connect.

What is the total power capacity of the project?

The SINES Data Campus has a total planned power capacity of 1.2 gigawatts. The first phase, which opened in 2023, provided 15 megawatts of IT load capacity across six data halls.

Good reading and sources

    Where this page comes from

    There is no English Wikipedia article on Start Campus yet, so the facts on this page come from the sources listed above: startcampus.pt/, datacenterdynamics.com/en/news/start-campus-breaks-ground-on-495mw-sin. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.

    It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.

    The weekly digest

    Every Monday: the data centre of the day, new pages on EveryDatacenter, and the conferences and anniversaries of the week ahead.