Colocation campus in Ultimo, Sydney with 90MW planned capacity.

Global Switch operates two conjoined data centre buildings in the Ultimo district of Sydney. The site currently provides 42.5MW of power and is expanding to reach 90MW through densification rather than new floor space.

Share on WhatsApp

  • Planned capacity increase from 42.5MW to 90MW
  • Located on an 11,090 sqm site in Ultimo
  • Expansion adds 12m to building height
  • Former tenants include Australian government departments

What it is

Global Switch Sydney is a colocation facility located in the Ultimo suburb of Sydney. It consists of two adjacent buildings known as Sydney West and Sydney East. The site sits on an 11,090 square metre plot. Global Switch operates the facility, which currently offers 42.5 megawatts of power capacity. The company plans to increase this to 90 megawatts. The expansion focuses on higher power density within existing structures rather than adding significant new white space.

How it came about

The Sydney West building was constructed in the early 2000s. It is a seven-story structure. The Sydney East building followed in the mid to late 2010s and has six stories. Global Switch recently filed plans with New South Wales authorities to expand the site. The proposal includes adding two levels and converting existing floors for electrical and plant use. This move aims to nearly double the site's power capacity to meet growing digital service demands.

The building and the halls

The campus comprises two conjoined buildings at 392-422 Harris Street and 273 Pyrmont Street. The total site area is 11,090 square metres. The proposed expansion will increase the building height by 12 metres. Most new construction will be dedicated to plant rooms and electrical infrastructure. This design choice allows for greater power density without significantly increasing the amount of customer-facing floor space.

Power and cooling

The site currently delivers 20.5MW from the West building and 22MW from the East. The expansion plan adds 24.5MW to West and 23MW to East. This brings the total planned capacity to 90MW. The project increases power consumption by 47.5MW. The focus is on supporting high-density equipment rather than expanding physical footprint.

What runs inside

The facility serves enterprise customers requiring colocation services. Several Australian government agencies previously leased space here. These included the Department of Home Affairs and the Australian Securities and Investments Commission. These departments left after Chinese investors took control of Global Switch. The expansion is driven by demand for digital and data services in the local economy.

The place

The data centre is situated in Ultimo, an urban area of Sydney. Global Switch views expanding this existing location as preferable to finding a new site in the Pyrmont locality. The dense urban setting limits horizontal growth, leading to vertical expansion and internal retrofitting. The site is close to other infrastructure in the inner city.

Environment and impact

Ownership by Jiangsu Shagang Group has affected tenant composition. Government bodies withdrew from the site due to security concerns linked to Chinese ownership. Current stakeholders are reportedly looking to sell their shares. Potential buyers include EQT and NextDC. The expansion aims to support the digital economy while working within existing urban constraints.

Questions people ask about Global Switch Sydney

What is the current power capacity of Global Switch Sydney?

The site currently offers 42.5 megawatts of power. This is split between the Sydney West building at 20.5MW and the Sydney East building at 22MW.

Why did government departments leave the facility?

Several Australian government agencies left after Chinese investors, specifically Jiangsu Shagang Group, took control of Global Switch. Security concerns were cited as the reason for their departure.

How is the capacity being increased?

The expansion adds two levels and converts existing floor space into plant and electrical areas. This increases power density to 90MW without significantly adding new white space.

Good reading and sources

    Where this page comes from

    There is no English Wikipedia article on Global Switch Sydney yet, so the facts on this page come from the sources listed above: datacenterdynamics.com/en/news/global-switch-files-to-add-47mw-of-capa. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.

    It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.

    Photo credits on this page

    The small pictures above come from Wikimedia Commons under free licences. Some are cropped to fit.

    The weekly digest

    Every Monday: the data centre of the day, new pages on EveryDatacenter, and the conferences and anniversaries of the week ahead.