Hyperion
Meta's 5 GW AI campus under construction in Richland Parish, Louisiana
Hyperion is a huge artificial intelligence campus that Meta Platforms is building beside Louisiana Highway 183, just outside Holly Ridge in Richland Parish. Work began in 2024 and is meant to run to 2032, with about 2 GW of computing live by 2030 and a final draw near 5 GW. It matters because it is one of the largest single data centre projects ever announced.
- Site covers 2,250 acres (9.1 km2) near Holly Ridge, Louisiana
- Planned computing draw of 5 GW, with about 2 GW live by 2030
- Investment above US$50 billion after the July 2026 expansion
- Entergy to generate at least 3.8 GW and build three gas plants
- Announced 4 December 2024 under the code name Project Sucre
What it is
Hyperion is the nickname for the Richland Parish Data Center, an artificial intelligence computing campus Meta Platforms is putting up along Louisiana Highway 183, a short way outside Holly Ridge. The site covers 2,250 acres (9.1 km2) and the finished complex is meant to hold 4,000,000 square feet (371,612 m2) of building. Meta groups it with other very large AI sites it calls titan clusters, intended for work on artificial superintelligence. Power draw is planned at up to 5 GW, with roughly 2 GW running by 2030 and the rest completed around 2032. Planned spending now exceeds US$50 billion.
How it came about
Meta searched for a flagship site during early 2024 and kept the choice hidden under the code name Project Sucre, a label even state officials had to use. The project was revealed on 4 December 2024 without naming its scale, and money moved at first through a shell company called Laidley LLC. Zuckerberg drew wide notice with a Threads post on 14 July 2025 showing the building laid over Manhattan. Cost estimates grew from over $10 billion to at least $27 billion through a Blue Owl Capital deal in October 2025, then past $50 billion after a July 2026 expansion to 5 GW.
The building and the halls
The campus occupies 2,250 acres (9.1 km2) beside Louisiana Highway 183 near Holly Ridge, with 4,000,000 square feet (371,612 m2) of floors planned across it. The land, once known as Franklin Farms, was bought by the state from the Franklin family in 2006 with an automotive plant in mind. Louisiana had to change its rules so the plot could be sold straight to Meta rather than offered at public auction. Construction runs from 2024 to 2032 and the site is still being built.
Power and cooling
The finished campus is expected to draw as much as 5 GW, with about 2 GW available by 2030. Under its agreement with Meta, Entergy intends to generate at least 3.8 GW for the site and has begun work on three gas-fired combined-cycle plants plus a substation. Entergy says wider generation will push prices down, while its own June 2025 filings indicated bills would climb and land on consumers. Meta has promised clean generation equal to everything Hyperion uses. Residents have reported outages since building work started, which Entergy rejects as linked.
What runs inside
Meta Platforms is the sole named user, taking computing space as a tenant rather than holding the site itself. The halls are aimed at artificial intelligence work, part of a group of titan clusters Meta is assembling ahead of what it expects to be artificial superintelligence. A lease beginning in 2029 runs four years and cannot be cancelled, with options to extend it for as long as twenty years. Meta's initial commitment across that lease is about $12.3 billion.
The place
The plot sits in Richland Parish, Louisiana, just outside Holly Ridge, along Highway 183. Meta wanted very large unbroken land with energy and infrastructure already close, and the ability to start quickly. Entergy, based in Louisiana, pushed for the campus in its own territory and negotiated tax relief with the state. Lawmakers passed Act 730, giving sizeable rebates on equipment bought or leased for data centres. Delta Community College responded by widening its construction and trades courses.
Environment and impact
Governor Jeff Landry welcomed the project as a new chapter with well-paid work, and Louisiana Economic Development cited Meta's figure of 1,500 jobs. Business Facilities Magazine gave it the 2024 Deal of the Year Platinum Award. Critics objected to how fast the state approved it and doubted the environmental and price claims. The Sierra Club accused Meta of gentrifying the area, and Earthjustice tried unsuccessfully to subpoena the company over environmental compliance. Holly Ridge residents complain about lorry traffic, rising costs and contractors brought in from outside Louisiana.
Network and links
No fibre routes, subsea cables or internet exchanges are described for the campus.
Questions people ask about Hyperion
What is Hyperion?
It is the nickname for the Richland Parish Data Center, a very large artificial intelligence campus Meta Platforms is building beside Louisiana Highway 183 near Holly Ridge. The site covers 2,250 acres and is planned to hold 4,000,000 square feet of building once finished around 2032.
Who owns the site?
Meta Platforms runs it and is the tenant, but the property sits with Beignet Investors, a special purpose vehicle managed by Blue Owl Capital. That arrangement keeps the project off Meta's balance sheet, with bonds repaid from lease payments.
How much power will it need?
Up to 5 GW of computing capacity is planned, with roughly 2 GW expected to be running by 2030 and the remainder completed around 2032. Entergy has agreed to produce at least 3.8 GW and is building three gas-fired plants and a substation.
Why was Louisiana chosen?
Meta wanted huge unbroken land with energy and infrastructure close by and the freedom to move fast. Entergy pushed for its home state and negotiated tax relief, and lawmakers passed Act 730 giving rebates on data centre equipment. The state also changed its rules so the land could be sold directly.
What concerns have local people raised?
Residents of Holly Ridge cite heavy construction traffic, rising living costs and the use of out-of-state contractors. Environmental groups doubt the clean energy claims, and some report power cuts since work began, which Entergy denies are connected.
Good reading and sources
- Official websiteOfficial site
- Mark Zuckerberg says Meta is building a 5GW AI data centerTechCrunch, Article
- To land Meta鈥檚 massive $10 billion data center, Louisiana pulled out all the stops. Will it be worth it?CNBC, Article
- Meta to spend hundreds of billions on AI data centres, says Mark ZuckerbergBBC, Article
- Louisiana Hands Meta a Tax Break and Power for Its Biggest Data CenterWired, Article
The facts on this page come from the Wikipedia article "Hyperion Data Center", written by its contributors and used under the CC BY-SA 4.0 licence, and from its Wikidata record (CC0). EveryDatacenter rewrote the text in its own words, with AI assistance, and compares every page with the article to make sure no passage is copied. It may be reused under the same CC BY-SA 4.0 licence with a link back.
It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.