Kasi Cloud
Hyperscale and AI-ready data centre campus in Lagos, Nigeria.
Kasi Cloud operates a carrier-neutral data centre campus in Lekki, Lagos. The first building, LOS1, entered operational readiness in May 2026 with capacity to scale to 100 megawatts. It supports artificial intelligence workloads and sovereign cloud hosting for Nigerian enterprises.
- First hyperscale-ready AI campus in West Africa
- Located adjacent to six subsea cable systems
- Designed to scale to 100 MW critical capacity
- Supports Nigeria National Cloud Policy 2025
- Backed by Nigerian Sovereign Investment Authority
What it is
Kasi Cloud is a digital infrastructure company developing hyperscale data centre campuses in Africa. Its primary facility is located in the Maiyegun area of Lekki, Lagos. The campus is designed to be carrier-neutral and capable of supporting high-density artificial intelligence computing. The first building, known as LOS1, was commissioned in May 2026. The site aims to provide sovereign cloud options for local businesses and government bodies, reducing reliance on foreign infrastructure.
How it came about
The project began with a groundbreaking ceremony in 2022, attended by Lagos State Governor Babajide Sanwo-Olu. The Nigerian Sovereign Investment Authority backed the initiative as part of a strategy to boost domestic digital assets. Construction proceeded on the four-hectare site in Lekki. In May 2026, the company held a flag-off ceremony to mark the transition of LOS1 from construction to operational readiness. This event included federal ministers and state officials, signalling the start of commercial operations.
The building and the halls
The campus occupies approximately four hectares in Lekki. It is engineered to meet Uptime Institute Tier III standards for reliability. The design supports high interconnection density and scale-out infrastructure. LOS1 is built to handle accelerated computing environments required for modern artificial intelligence tasks. The facility aims for sub-50 millisecond latency for workloads remaining within Nigeria. Security and operational protocols are aligned with national data protection regulations.
Power and cooling
The campus has a long-term design capacity of 100 megawatts of critical IT load. Power supply relies on a hybrid model using natural gas, solar energy, and battery storage systems. The infrastructure includes an N+1 redundancy configuration to ensure high availability. A direct connection to the Transmission Company of Nigeria 132 kilovolt grid provides primary power. The operator targets a power usage effectiveness ratio of 1.6 or lower to maintain energy efficiency.
What runs inside
The facility serves as a platform for hyperscale cloud services and enterprise digital transformation. It targets Nigerian financial institutions, government agencies, and global digital enterprises entering the African market. The campus supports the National Cloud Policy 2025, which mandates in-country hosting for sensitive data. By providing local infrastructure, it allows organisations to keep data under Nigerian legal jurisdiction. It also facilitates regional interconnection for content and network providers.
The place
Lagos was chosen for its status as a major economic hub and its proximity to subsea cable landing stations. The site sits adjacent to six cable systems, including Equiano and 2Africa. This location offers direct access to international bandwidth. The Nigerian government views the project as a key component of its economic diversification agenda. Local authorities have committed to supporting world-class digital infrastructure to sustain the city's growth.
Environment and impact
The project aims to retain an estimated $850 million in annual cloud spending that previously left the country. It creates a sovereign alternative for data hosting, addressing concerns about foreign legal jurisdiction over Nigerian data. The Nigerian Sovereign Investment Authority cites the facility as a strategic asset for national resilience. The development is expected to drive job creation and support the local technology ecosystem through improved infrastructure.
Network and links
The campus is carrier-neutral, allowing multiple network providers to connect directly. Its location next to six subsea cable landing stations ensures robust international connectivity. This proximity reduces latency for traffic moving between local users and global networks. The high interconnection density fabric supports digital ecosystems by enabling efficient peering and data exchange among tenants and service providers.
Questions people ask about Kasi Cloud
Where is the Kasi Cloud data centre located?
The campus is situated in the Maiyegun area of Lekki, Lagos, Nigeria. It is positioned next to six subsea cable landing stations, including Equiano and 2Africa, to ensure strong connectivity.
What is the power capacity of the facility?
The campus is designed to scale to approximately 100 megawatts of critical IT capacity. The first building, LOS1, uses a hybrid power system combining gas, solar, and battery storage.
Who invested in Kasi Cloud?
The Nigerian Sovereign Investment Authority is a foundational investor. The project also has support from Lagos State and the Federal Government of Nigeria as part of national digital infrastructure strategies.
When did the data centre open?
The groundbreaking took place in 2022. The first building, LOS1, entered operational readiness in May 2026, marking the start of its commissioning phase for commercial use.
Good reading and sources
There is no English Wikipedia article on Kasi Cloud yet, so the facts on this page come from the sources listed above: kasicloud.com/, finance.yahoo.com/sectors/technology/articles/kasi-cloud-datacenters-c. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.
It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.