Kao Data
UK data centre operator focused on AI and hyperscale infrastructure.
Kao Data designs and operates high-capacity data centres in the United Kingdom. The company focuses on facilities engineered for artificial intelligence and advanced computing workloads. Its portfolio includes sites near London and a planned campus in Greater Manchester.
- Portfolio exceeds 160 MW of IT load capacity
- Facilities located east and west of London
- Greater Manchester site due late 2025
- NVIDIA DGX-Ready certified data centres
- Guarantees 100% uptime for customers
What it is
Kao Data is a United Kingdom-based developer and operator of data centres. The company builds facilities designed to support artificial intelligence and advanced computing tasks. Its infrastructure serves customers who need secure and scalable environments for mission-critical workloads. The portfolio currently holds more than 160 megawatts of IT load capacity. This figure includes sites that are already running, those under construction, and those in the planning stages. The company positions its facilities as hyperscale-inspired, catering to high-density compute demands.
How it came about
The company describes its development over the last ten years as a busy period of growth. It has established a presence with facilities located to the east and west of London. One of these London sites is reported to be fully occupied. Kao Data is now expanding northward with a major project in Greater Manchester. This new facility is described as the largest data centre in the north of England. The company states it is due to open in late 2025. The organisation claims several industry firsts during its operational history.
The building and the halls
Kao Data operates award-winning facilities that have received NVIDIA DGX-Ready certification. This certification indicates the hardware and infrastructure are optimized for specific AI computing systems. The company designs and engineers its own buildings rather than relying solely on third-party developers. Its London campus is described as the largest purpose-built data centre development in the UK. The Greater Manchester site is also being built to accommodate large-scale industrial compute needs. The team responsible for engineering and operations is cited as highly respected within the sector.
Power and cooling
The total IT load capacity across the Kao Data portfolio exceeds 160 megawatts. This power figure accounts for all operational, developing, and planned sites. The company states that its energy efficiency and sustainability credentials underpin this capacity. While specific cooling technologies or energy sources like wind or solar are not detailed in the provided text, the firm emphasizes its environmental, social, and governance standards. The facilities are built to handle the high power densities required by next-generation AI hardware.
What runs inside
Customers use Kao Data facilities for colocation services. The primary workloads supported include artificial intelligence training and inference, enterprise IT systems, and public cloud infrastructure. The company targets clients with mission-critical computing needs that require high availability. It guarantees 100 per cent uptime for its services. The infrastructure is tailored for technology partners and enterprises deploying demanding compute applications. The NVIDIA DGX-Ready status specifically supports AI-focused tenants.
The place
Kao Data鈥檚 facilities are situated in key economic regions of the United Kingdom. It has a strong footprint in the Greater London area, with sites in both the eastern and western zones. The western facility is located in what the company calls the West London Availability Zone. The expansion into Greater Manchester marks a significant move into northern England. This location was chosen to host the region鈥檚 largest data centre. The sites are generally in suburban or industrial areas suitable for large-scale infrastructure.
Environment and impact
The company highlights its commitment to sustainability and ESG criteria. Kao Data is backed by international investors, suggesting significant capital inflow into the UK digital infrastructure sector. The development of the Greater Manchester site is expected to bring industrial-scale capacity to the north. The company promotes its role in supporting the future of high-capacity computing in the region.
Questions people ask about Kao Data
What type of workloads does Kao Data support?
Kao Data supports mission-critical artificial intelligence, enterprise, and cloud workloads. Its facilities are engineered for advanced computing and are NVIDIA DGX-Ready, making them suitable for high-demand AI tasks.
Where are Kao Data's facilities located?
The company has facilities located to the east and west of London. It is also developing a large data centre in Greater Manchester, which is scheduled to open in late 2025.
What is the total power capacity of Kao Data?
Kao Data reports a portfolio of more than 160 megawatts of IT load. This total includes capacity that is currently operational, under development, or in the planning stages.
Does Kao Data guarantee service availability?
Yes, the company provides a guarantee of 100% uptime for its colocation customers. This ensures a secure and reliable environment for mission-critical computing infrastructure.
Good reading and sources
There is no English Wikipedia article on Kao Data yet, so the facts on this page come from the sources listed above: kaodata.com/about/, datacenterdynamics.com/en/video-interviews/studio/dcdtalks-exploring-t. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.