Eight-storey data centre in Mahape with 45 MW capacity

NTT operates this eight-storey facility in the Mahape area of Navi Mumbai. It provides 45 megawatts of power and space for roughly 5,000 racks across 400,000 square feet. The site forms part of a larger plan to create multiple availability zones in the Mumbai region.

Share on WhatsApp

  • Eight-storey building in Mahape, Navi Mumbai
  • 45 MW initial power capacity with 150 MW planned
  • Space for approximately 5,000 server racks
  • Part of Mumbai availability triangle with Chandivali and Airoli
  • Connected to MISTcable subsea system

What it is

This facility is an eight-storey data centre located in the Mahape area of Navi Mumbai. NTT runs the site, which offers 45 megawatts of IT power and space for approximately 5,000 server racks. The building covers 400,000 square feet on an eight-acre plot. It serves as a key node in the company’s strategy to provide carrier-neutral hosting services in India. The campus supports enterprises that require mission-critical infrastructure and global connectivity options.

How it came about

NTT consolidated its Indian operations, including Netmagic, into a single unit in early 2021. Following this merger, the company announced plans to expand its footprint significantly. The Mahape campus was developed as part of this growth strategy. NTT also launched a facility in Chandivali around the same time. The company aims to create an availability triangle in the Mumbai region with sites in Chandivali, Mahape, and Airoli. This expansion allows clients to distribute their IT load across multiple zones.

The building and the halls

The NAV1A building stands eight stories tall on an eight-acre site in Mahape. It provides 400,000 square feet of floor space. The campus is designed to accommodate up to four data centre buildings in total. The current phase includes this primary structure. The design supports high-density rack deployments. The site is part of a broader portfolio that includes other facilities in Mumbai and Navi Mumbai. The layout facilitates interconnection between different availability zones within the region.

Power and cooling

The initial phase of the Mahape campus delivers 45 megawatts of power capacity. The entire site is planned to reach up to 150 megawatts when fully built out. Phase one involves developing 90 megawatts across two buildings. NTT supports its energy needs with renewable sources. The company has constructed a solar power plant in Solapur, Maharashtra. It also operates a combined wind and solar energy plant in Karnataka. These facilities help power the data centre network across the country.

What runs inside

The centre provides colocation services for over 1,000 enterprise customers. It supports mission-critical hosted applications for businesses in global and emerging markets. Clients can use the facility to plan IT infrastructure across multiple availability zones. These zones are connected via NTT’s Data Center Interconnect fabric. The site also leverages the Mumbai landing station for the MISTcable system. This subsea cable links India with Singapore and Myanmar, enabling global network reach.

The place

Mahape is located in Navi Mumbai, a planned city in the Mumbai metropolitan region. The area was chosen to support the creation of an availability triangle in the Mumbai region. This geographic distribution helps ensure redundancy and resilience for client workloads. The site sits alongside other major NTT facilities in Chandivali and Airoli. The location provides access to key subsea cable landing stations. This connectivity is vital for businesses requiring low-latency links to international markets.

Environment and impact

NTT states it is India’s leading carrier-neutral managed IT services provider. The company employs qualified professionals to maintain data centre operations. Its expansion into Navi Mumbai and other cities aims to double its existing footprint. The development supports the growing demand for digital infrastructure in India. By using renewable energy plants in Maharashtra and Karnataka, the company seeks to reduce the environmental impact of its operations. The project contributes to the local technology ecosystem.

Network and links

The facility connects to NTT’s Data Center Interconnect fabric. This network links the Mahape site with other availability zones in Mumbai. Clients benefit from direct access to the MISTcable system. This subsea fibre optic cable connects India to Singapore and Myanmar. The carrier-neutral nature of the centre allows tenants to choose from various network providers. This setup supports robust global connectivity for enterprises operating in the region.

Questions people ask about NTT Navi Mumbai data centre campus

Where is the NTT Navi Mumbai data centre located?

The facility is situated in the Mahape area of Navi Mumbai, India. It occupies an eight-acre site and features an eight-storey building dedicated to data centre operations.

What is the power capacity of the Mahape campus?

The initial phase offers 45 megawatts of IT power. The entire campus is planned to reach a total capacity of 150 megawatts once all four proposed buildings are completed.

How does this site connect to global networks?

It connects via NTT’s Data Center Interconnect fabric and the MISTcable subsea system. This cable links India with Singapore and Myanmar, providing clients with international bandwidth.

Good reading and sources

    Where this page comes from

    There is no English Wikipedia article on NTT Navi Mumbai data centre campus yet, so the facts on this page come from the sources listed above: nttdata.com/en-in/services/global-data-centers/global-locations/india/, datacenterdynamics.com/en/news/ntt-opens-data-centers-in-mumbai-and-na. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.

    It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.

    The weekly digest

    Every Monday: the data centre of the day, new pages on EveryDatacenter, and the conferences and anniversaries of the week ahead.