ODATA operates four interconnected hyperscale facilities in the Querétaro region of Mexico. The sites support cloud, artificial intelligence and high-performance computing with Tier III design and up to 24 megawatts of capacity at the newest location.
- Four interconnected hyperscale sites in Querétaro
- QR04 offers 24 MW total capacity
- Uses Aligned Delta Cube air cooling
- Tier III design for high availability
- Supports AI and high-performance computing
What it is
ODATA runs a network of four hyperscale data centres in the Querétaro region of Mexico. These facilities serve large enterprises and cloud providers needing robust infrastructure for artificial intelligence and high-performance computing. The company designs its sites to handle high-density workloads with continuous availability. Each building follows Tier III standards for redundancy and reliability. The campuses are located in industrial parks near Querétaro and San Miguel de Allende, providing strategic connectivity within Latin America.
How it came about
ODATA began operations in the region with the QR01 campus, which went live in 2022. The QR02 facility followed a year later. In May 2026, the first phase of QR03 became operational. Construction on the fourth site, QR04, started in July 2024. The first 12 megawatt phase of QR04 launched in late 2025, completing the initial network of four interconnected sites. ODATA was founded in 2015 and acquired by Aligned Data Centers in May 2023.
The building and the halls
The facilities are built with concrete slabs on the ground and steel structures. They are located in industrial zones such as VYNMSA, Amexhe, and PyME parks. The design prioritises structural integrity for heavy IT equipment. Each site is engineered to meet Tier III specifications, ensuring concurrent maintainability. The buildings support 24/7 operations with secure access controls. The QR04 site is situated near San Miguel de Allende, expanding the company’s footprint in the central Mexican region.
Power and cooling
The campuses require significant electrical capacity to support hyperscale demands. QR04 has a total planned capacity of 24 megawatts, with the first 12 megawatts currently active. The infrastructure is designed to handle high-density power loads for AI training. Cooling systems include the Delta Cube solution, which uses air to manage heat densities up to 50 kilowatts per rack. A closed-loop water system also assists in maintaining optimal temperatures for IT environments, improving energy efficiency.
What runs inside
These data centres host critical digital operations for cloud services and artificial intelligence applications. Tenants include hyperscale customers who need low-latency connections to users in Mexico and the United States. The infrastructure supports high-performance computing tasks that process large volumes of data. By locating in Querétaro, ODATA provides a bridge for regional connectivity, allowing businesses to distribute their workloads across Latin America while maintaining proximity to North American markets.
The place
Querétaro is a key hub for digital infrastructure in Mexico due to its robust economy and developed telecommunications network. The region offers strategic advantages for connecting to major carriers in the country. Its proximity to the United States facilitates low-latency links for cross-border data traffic. The area has seen increased investment in energy capacity, supporting the growth of data-intensive industries. Industrial parks in the state provide suitable land for large-scale facility development.
Network and links
The sites are positioned to connect with major telecommunications carriers in Mexico. This connectivity supports low-latency operations for digital services across the region. The network architecture allows for distributed applications that require fast data transfer between Mexico and the United States. ODATA emphasises strategic interconnection capabilities to support mission-critical operations for its clients.
Questions people ask about ODATA Querétaro campus
Who owns and operates the ODATA Querétaro campuses?
ODATA operates the facilities. The company was acquired by Aligned Data Centers in May 2023. ODATA was originally founded in 2015 by Patria Investments.
What cooling technology is used at these data centres?
The sites use the Delta Cube air-cooling solution developed by Aligned. This system handles densities up to 50 kW per rack. QR04 also features a closed-loop water system for additional cooling efficiency.
When did the first data centre in this campus open?
The first facility, QR01, went live in 2022. Subsequent sites QR02 and QR03 opened in the following years, with QR04 launching its first phase in late 2025.
Good reading and sources
There is no English Wikipedia article on ODATA Querétaro campus yet, so the facts on this page come from the sources listed above: odatadc.com/localidades-mexico/, datacenterdynamics.com/en/news/odata-launches-fourth-data-center-in-qu. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.