The Stargate Project
AI data centre joint venture building gigawatt-scale campuses in the US and abroad
The Stargate Project, incorporated in Delaware as Stargate LLC, is an AI infrastructure joint venture formed by OpenAI, SoftBank, Oracle and MGX and announced on 21 January 2025. It plans to spend up to US$500 billion on US data centres by 2029, with sites in Texas, New Mexico, Ohio and partnerships extending to the UAE and Argentina.
- Announced 21 January 2025 by President Donald Trump at the White House
- Up to US$500 billion of US AI infrastructure planned by 2029
- Nearly 7 GW of capacity planned across five new sites announced in September 2025
- SoftBank and OpenAI each committed US$19 billion and hold 40% each
- First campuses under construction at Abilene, Texas
What it is
The Stargate Project is a joint venture set up to build very large data centres for artificial intelligence work. It was created by OpenAI, SoftBank, Oracle and the investment firm MGX, and incorporated in Delaware as Stargate LLC. The plan is to spend up to US$500 billion inside the United States by 2029, starting with campuses in Abilene, Texas and adding sites in Shackelford County and Milam County in Texas, Do帽a Ana County in New Mexico, Lordstown in Ohio, and one midwestern location still unannounced. Planned capacity across these sites approaches 7 gigawatts, a measure of electrical load roughly equal to the draw of several million homes. The computing halls are intended for AI training and inference, and the built infrastructure is reserved for OpenAI.
How it came about
Work on the concept began in 2022. The name had earlier been used in 2024 by OpenAI and Microsoft for a separate US$100 billion supercomputer plan, itself named after the 1994 film. President Donald Trump announced the venture at the White House on 21 January 2025 alongside Sam Altman, Larry Ellison and Masayoshi Son. In September 2025 OpenAI added five further sites, taking planned capacity close to 7 GW and committed investment past US$400 billion. A Bloomberg report in August 2025 said the programme had stalled and that market conditions, US trade policy and hardware valuations were behind the delay.
The building and the halls
Ten data centres were under construction at Abilene, Texas, according to Larry Ellison. The Abilene project is developed by a joint venture of Blue Owl Capital, Crusoe Energy Systems and Primary Digital Infrastructure and leased to Oracle. Further campuses were announced for Shackelford County and Milam County in Texas, Do帽a Ana County in New Mexico and Lordstown in Ohio, plus one midwestern site whose location is not public. Overseas, a UAE facility was planned for 2026 and a Patagonian site in Argentina was proposed.
Power and cooling
The venture's January 2025 commitment was 10 gigawatts of capacity, and by September 2025 nearly 7 GW was planned across announced sites. Trump said emergency declarations would speed up energy infrastructure for the project. Hardware supply agreements cover up to 6 GW of AMD Instinct GPUs and 10 GW of custom silicon from Broadcom. Details of on-site generation, cooling methods and water use were not given.
What runs inside
The computing capacity is dedicated to OpenAI, which holds operational responsibility while SoftBank carries financial responsibility. Initial technology partners are Arm, Microsoft, Nvidia, Oracle and OpenAI. A parallel agreement gives Microsoft a right of first refusal over future OpenAI cloud capacity, while letting OpenAI turn to other providers if Microsoft passes. Larry Ellison suggested the platform could support AI-designed mRNA cancer vaccines produced robotically within about 48 hours.
The place
The first campuses sit in and around Abilene, Texas, with later sites spread across rural Texas, southern New Mexico and northeastern Ohio. Overseas interest has been reported in the United Kingdom, Norway, Japan and the United Arab Emirates, and a letter of intent covers a Patagonian site in Argentina described as cold and sparsely populated. The venture says it will create more than 100,000 jobs in the United States.
Environment and impact
Because of its size, the programme has been compared to the Manhattan Project. Questions about financing have been public: Elon Musk said the promised investment was not backed, a claim Sam Altman rejected, while Arm's Rene Haas described the backing as solid. Reporting by The Wall Street Journal suggested much of SoftBank's contribution could arrive as debt rather than equity. In Argentina, no formal application had reached the Economy Ministry's large venture incentive scheme as of May 2026.
Network and links
Microsoft and OpenAI signed an agreement at the announcement giving Microsoft first refusal on future OpenAI cloud capacity while permitting other cloud suppliers. Nvidia, Cisco and OpenAI are named partners on the UAE build, alongside G42, Oracle and SoftBank. No specific fibre routes, subsea cables or internet exchanges were identified.
Questions people ask about The Stargate Project
What is the Stargate Project?
It is an AI infrastructure joint venture formed by OpenAI, SoftBank, Oracle and MGX, incorporated in Delaware as Stargate LLC. It plans to spend up to US$500 billion building data centres in the United States by 2029, with the computing capacity reserved for OpenAI.
Who runs it?
Masayoshi Son, chief executive of SoftBank, is chairman. Sam Altman has said SoftBank holds financial responsibility while OpenAI carries operational responsibility. Ownership is split 40% to OpenAI, 40% to SoftBank, with Oracle and MGX also holding stakes.
Where are the data centres being built?
Construction started at Abilene, Texas. Announced sites also cover Shackelford County and Milam County in Texas, Do帽a Ana County in New Mexico, Lordstown in Ohio and one undisclosed midwestern location. Projects in the United Arab Emirates and Argentina have been announced separately.
How much power will it use?
The January 2025 commitment was 10 gigawatts of capacity. By September 2025, announced sites totalled nearly 7 GW of planned capacity, with over US$400 billion of investment expected over three years.
Is the financing in place?
SoftBank and OpenAI each committed US$19 billion initially, Oracle and MGX US$7 billion each, with the rest from limited partners and debt. Elon Musk publicly doubted the funding, which Sam Altman denied. Bloomberg reported in August 2025 that no funds had been raised toward the full US$500 billion.
Good reading and sources
- OpenAI announces 'The Stargate Project:' $500bn over four years on AI infrastructureDCD, Article
- Trump unveils $500bn Stargate AI project between OpenAI, Oracle and SoftBankThe Guardian, Article
The facts on this page come from the Wikipedia article "Stargate LLC", written by its contributors and used under the CC BY-SA 4.0 licence, and from its Wikidata record (CC0). EveryDatacenter rewrote the text in its own words, with AI assistance, and compares every page with the article to make sure no passage is copied. It may be reused under the same CC BY-SA 4.0 licence with a link back.