MEGA Plus
Large data centre campus in Tseung Kwan O, Hong Kong
SUNeVision is building a major data centre complex in Tseung Kwan O, Hong Kong. The multi-phase project aims to deliver over 180 megawatts of power capacity to support artificial intelligence and cloud services.
- Planned capacity exceeds 180 megawatts
- Total area will reach 1.2 million square feet
- Government designated the site for high-tier use
- Investment exceeds HK$15 billion
- Part of SUNeVision鈥檚 eight-centre portfolio
What it is
MEGA Plus is a large-scale data centre campus under construction in Tseung Kwan O, Hong Kong. SUNeVision, the technology subsidiary of Sun Hung Kai Properties, is developing the facility. The project is designed to provide substantial computing power for modern digital needs. It will eventually cover 1.2 million square feet and offer more than 180 megawatts of electrical capacity. The company positions it as a key infrastructure asset for the region.
How it came about
Construction of the second phase began recently, adding significant floor space to the initial build. The first phase launched the previous year, providing 50 megawatts of capacity across 500,000 square feet. The entire three-phase development is scheduled for completion between 2026 and 2027. SUNeVision states that the total investment in this specific campus has surpassed HK$15 billion.
The building and the halls
The campus is located in Tseung Kwan O. Phase two adds 350,000 square feet to the existing structure. When all three phases are finished, the total built area will reach 1.2 million square feet. The design includes multiple backup power systems to ensure resilience. The company describes the infrastructure as highly robust to meet strict operational requirements.
Power and cooling
The facility is planned to deliver over 180 megawatts of power capacity upon full completion. This energy supply is intended to support the high demands of artificial intelligence workloads. The system features redundant power sources to maintain uninterrupted service. SUNeVision notes that the site was chosen by the government for high-tier data centre development, implying strong grid support.
What runs inside
The campus targets customers with high energy needs, particularly those in artificial intelligence. It aims to provide ultra-low latency and continuous operations for these clients. The infrastructure supports the broader goal of advancing AI capabilities in Hong Kong. It serves as part of SUNeVision鈥檚 larger network of eight data centres in the territory.
The place
Tseung Kwan O hosts this major digital infrastructure project. The Hong Kong government designated the site specifically for high-tier data centre development. Officials have stated their commitment to supporting AI growth in the region. The project is expected to attract further billions in investment to the local economy.
Environment and impact
The development represents a significant financial commitment, with over HK$15 billion invested so far. Company leaders hope it will draw tens of billions more in total investment to Hong Kong. Government officials view AI as central to developing new productive forces. The project aligns with state strategies to boost the local technology sector.
Network and links
SUNeVision operates cable landing stations HKIS-1 and HKIS-2 in Hong Kong. These facilities connect local networks to international subsea cables.
Questions people ask about MEGA Plus
Who is building the MEGA Plus campus?
SUNeVision Holdings Ltd is developing the campus. It is the technology arm of Sun Hung Kai Properties and the largest data centre provider in Hong Kong.
How much power will the facility provide?
Upon completion of all three phases, the campus will offer more than 180 megawatts of power capacity. The first phase alone delivered approximately 50 megawatts.
Where is the data centre located?
The facility is located in Tseung Kwan O, Hong Kong. The government specifically designated this site for the development of high-tier data centres.
When will the construction be finished?
Phase II is currently under construction. The completion of all three phases is scheduled for the period between 2026 and 2027.
Good reading and sources
There is no English Wikipedia article on MEGA Plus yet, so the facts on this page come from the sources listed above: sunevision.com/, datacenterdynamics.com/en/news/sunevision-begins-phase-ii-of-mega-camp. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.