Switch, Inc.
Las Vegas operator of SUPERNAP colocation campuses in the US and abroad
Switch, Inc. is an American data centre company founded in 2000 by Rob Roy and based in Las Vegas, Nevada. It builds and runs SUPERNAP colocation campuses in Nevada, Michigan and overseas, and was taken private in 2022 by DigitalBridge and IFM Investors.
- Bought a former Enron facility at auction for $930,000 in 2002
- All data centres on renewable energy since 1 January 2016
- TAHOE RENO 1: 130 MVA power and over 83,000 tons of cooling
- SUPERNAP 8 and 9 hold Uptime Institute Tier IV Gold certificates
- Taken private in December 2022 for $11 billion
What it is
Switch, Inc. is a privately held American company headquartered in Las Vegas, Nevada. Founded in 2000 by Rob Roy, it designs and operates SUPERNAP data centres and sells colocation, telecommunications, cloud services and content ecosystems. Its Las Vegas Core Campus holds eleven running data centres covering more than 2 million square feet, with a finished footprint above 2.3 million square feet across twelve buildings. A second campus, Citadel at Tahoe Reno Industrial Center in Storey County, spreads over 1,000 acres and is planned to exceed 7.2 million square feet. The firm also runs a campus in Grand Rapids, Michigan, and has projects in Italy and Thailand. It became a CLEC, selling the full range of telecom services.
How it came about
Rob Roy started the company in 2002 by buying a former Enron facility at auction for $930,000. The site sat directly above a fibre optic backbone Enron had planned to use for selling bandwidth. In 2008 Switch opened SUPERNAP 7 and announced a $350 million build aimed at packing in far more equipment than rival campuses. A $4 billion expansion followed in 2015 with the Citadel Campus near Reno. SUPERNAP International was formed in 2014 with ACDC Fund, Orascom TMT Investments and Accelero Capital. DigitalBridge and IFM Investors bought the company for $11 billion in December 2022, taking it private.
The building and the halls
The Las Vegas Core Campus is planned for twelve buildings and more than 2.3 million square feet when finished. SUPERNAP 7 opened in 2008 with 515,047 square feet, and LAS VEGAS 10 added about 350,000 square feet in 2017. At the Citadel site, TAHOE RENO 1 opened in February 2017 and will exceed 1.3 million square feet. The Pyramid Campus in Grand Rapids, a converted Steelcase building, opened in May 2017 and is planned to reach up to 1.8 million square feet. SUPERNAP 8 and SUPERNAP 9 both hold Uptime Institute Tier IV design, constructed facility and Gold Operational Sustainability certificates.
Power and cooling
All Switch data centres have run on clean and renewable energy since 1 January 2016. Two solar plants, Switch Station 1 and Switch Station 2, supply 179 megawatts and were built with First Solar and NV Energy before EDF Renewable Energy bought them in June 2017. A 555 MW Nevada solar project began construction in 2020, with 127 MW behind-the-meter at Citadel. TAHOE RENO 1 has 130 MVA of power and more than 83,000 tons of cooling. The company sued NV Energy over power pricing and in 2016 moved to its own solar supply after paying a $27 million exit fee.
What runs inside
Switch serves hundreds of clients, including Fortune 1000 companies. Workloads range from data warehouses at casinos and online games to modelling, e-commerce, spam filtering and utility computing. The firm set up a purchasing cooperative worth over $5 trillion so customers can buy telecom and other services together across its campuses. University researchers use the sites too: the iSupercomputer Cherry Creek project with Intel and UNLV sits on a Switch campus, and the Pronghorn supercomputer for the University of Nevada, Reno is housed in TAHOE RENO 1.
The place
The first facility rose in a run-down part of Las Vegas near East Sahara Avenue, chosen because it sat on the fibre backbone Enron had laid. Later campuses went to Storey County near Reno and to Grand Rapids, Michigan. Switch also runs Innovation Centers, including one in Reno opened in September 2015 with the University of Nevada, Reno, which hosts the Nevada Advanced Autonomous Systems Innovation Center working on robotics, drones, driverless cars and underwater vehicles.
Environment and impact
Greenpeace highlighted the company's renewable energy use in its 2017 report on the IT sector's energy footprint. Switch was the first US data centre service to sign the American Business Act on Climate Pledge in 2015 and joined the WWF/WRI Renewable Buyers' Principles in 2016. A dispute with NV Energy over electricity prices ended with the company paying a $27 million exit fee to move to its own solar supply. The workforce of 759 in 2020 included a large share of veterans, and half the top executives were women as of July 2015.
Network and links
The original Las Vegas building sits on the fibre optic backbone Enron laid to sell bandwidth to internet service providers. Switch holds CLEC status and sells all telecommunications services. Its SUPERNAP facilities carry the network links used by researchers accessing the Cherry Creek supercomputer. The Thailand campus is sited 27 kilometres from an international cable landing station that connects national and international telecom and IT carriers.
Questions people ask about Switch, Inc.
What does Switch, Inc. do?
It designs and runs SUPERNAP data centres, selling colocation, telecommunications, cloud services and content ecosystems. The company is based in Las Vegas and was founded in 2000 by Rob Roy, who is CEO, chairman and chief engineer.
Where are its data centres?
The Core Campus in Las Vegas has eleven operating data centres. Others sit near Reno at the Tahoe Reno Industrial Center, in Grand Rapids, Michigan, and internationally in Siziano, Italy and Chonburi Province, Thailand.
How is the company powered?
Since 1 January 2016 every Switch data centre has run on clean and renewable energy. Solar plants Switch Station 1 and Switch Station 2 supply 179 MW, and a 555 MW Nevada solar project started construction in 2020.
What tier are the facilities?
SUPERNAP 8 and SUPERNAP 9 have each earned Uptime Institute Tier IV Design and Constructed Facility certificates plus Tier IV Gold Operational Sustainability certificates.
Who owns Switch now?
DigitalBridge and IFM Investors acquired the company for $11 billion in December 2022, taking it private.
Good reading and sources
- Official websiteOfficial site
- SuperNAP 8 Earns Tier IV Gold Status for OperationsData Center Knowledge, Article
The facts on this page come from the Wikipedia article "Switch (company)", written by its contributors and used under the CC BY-SA 4.0 licence, and from its Wikidata record (CC0). EveryDatacenter rewrote the text in its own words, with AI assistance, and compares every page with the article to make sure no passage is copied. It may be reused under the same CC BY-SA 4.0 licence with a link back.