Tract
Developer of master-planned data centre parks in the US and UK
Tract is a developer that acquires land, secures zoning and power connections, and prepares sites for data centre construction. Founded in 2023 by Grant van Rooyen, it plans large campuses across the United States and has proposed its first European project in County Durham.
- Founded in 2023 by former Cologix CEO Grant van Rooyen
- Plans 1.6 GW campus on 1,060 acres in Lyon County, Nevada
- Proposed 500 MW campus in County Durham, UK
- Owns over 11,000 acres in Storey County, Nevada
- Parent company Tract Capital also owns developer Fleet DC
What it is
Tract is a company that develops master-planned data centre parks. It acquires large plots of land, handles zoning and entitlement processes, and ensures power infrastructure is in place. The goal is to create shovel-ready sites for other operators to build facilities. Headquartered in Colorado, the firm was established in 2023. It operates primarily in the United States but has announced its first expansion into Europe with a proposal in the United Kingdom. Its parent company, Tract Capital, also owns Fleet DC, a separate entity that builds on these prepared sites.
How it came about
The company launched in 2023 with initial projects in Nevada. Founder Grant van Rooyen, formerly the chief executive of Cologix, started the firm to focus on site preparation rather than facility operation. In June 2024, it expanded its land holdings in Storey County. Later that year, it acquired additional acreage in Lyon County. By late 2026, Tract announced plans for a campus in County Durham, marking its entry into the European market. The firm intends to submit planning applications for the UK site in December 2026.
The building and the halls
Tract does not typically construct the final data centre buildings itself but prepares the land for them. Its projects involve large rural parcels, such as the 1,060 acres near Silver Springs and over 11,000 acres in Storey County. The proposed Durham site would feature up to seven buildings. The company focuses on creating master-planned environments where infrastructure like substations is integrated into the design. Fleet DC, a sister company, may undertake the actual vertical construction on these lands.
Power and cooling
Power availability is central to Tract鈥檚 site selection. In Nevada, its Lyon County site supports up to 1.6 gigawatts, with 700 megawatts under utility study. The Storey County holdings target around 2 gigawatts. In the United Kingdom, the proposed Durham campus plans for 500 megawatts. This UK site is located near the Hawthorn Pit substation, which is being upgraded as part of the Eastern Green Link 1 project to import offshore wind energy. This connection aims to provide renewable power to the future facilities.
What runs inside
The sites are intended for hyperscale and cloud data centre operators. Tract prepares the ground so that tenants can move quickly into construction and operation. While specific tenants are not named for most sites, the scale suggests use by major technology firms requiring significant power and space. The Durham project is described as contributing to UK data storage objectives. Fleet DC may also develop facilities on these lands for various commercial users.
The place
Tract selects rural locations with access to substantial power grids. In Nevada, it operates in Storey and Lyon Counties, areas already growing as data centre hubs. The UK proposal targets County Durham, between South Hetton, Murton, and Easington Lane. This region is not a traditional hub but offers proximity to new grid infrastructure. The company states it aims to bring jobs and investment to these local communities while minimising landscape impact through careful planning.
Environment and impact
The company claims its projects bring economic benefits, including jobs and infrastructure investment. In Lyon County, officials welcomed the development for its potential to boost local growth. However, in Nevada, Tract faces an ongoing legal dispute with Switch, another operator in Storey County. The UK proposal emphasises a landscape-led approach to reduce environmental effects. Local feedback is being sought for the Durham plans before formal submission.
Questions people ask about Tract
What does Tract do?
Tract acquires land, secures zoning permits, and arranges power connections to create shovel-ready sites for data centres. It does not typically operate the facilities itself but prepares the infrastructure for other companies to build on.
Where is Tract based?
The company is based in Colorado, United States. It was founded there in 2023 and has since expanded its project portfolio across several US states and into the United Kingdom.
How big are Tract's projects?
Its projects are large-scale. The Nevada holdings in Storey County total around 2 GW capacity. A new site in Lyon County supports up to 1.6 GW. The proposed UK campus in Durham is planned for 500 MW across seven buildings.
Good reading and sources
There is no English Wikipedia article on Tract yet, so the facts on this page come from the sources listed above: datacenterdynamics.com/en/news/tract-expands-into-uk-plans-500mw-campu, datacenterdynamics.com/en/news/tract-acquires-1000-acres-in-nevada-for. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.