Utah Data Center
NSA data storage facility at Camp Williams, Utah, for intelligence community records
A data storage facility built for the United States Intelligence Community at Camp Williams near Bluffdale, Utah, completed in May 2014 at a cost of $1.5 billion. The National Security Agency leads operations there as executive agent for the Director of National Intelligence, supporting the Comprehensive National Cybersecurity Initiative, though its precise mission is classified.
- Completed May 2014 at a cost of $1.5 billion
- 100,000 sq ft of data centre space inside a 1 to 1.5 million sq ft complex
- Classified as a Tier III data centre
- Forbes estimated 3 to 12 exabytes of storage in 2013
- Power surges during construction delayed opening by a year
What it is
The Utah Data Center is a storage facility for the United States Intelligence Community, built to hold data on the scale of exabytes or more. It sits at Camp Williams near Bluffdale, Utah, in the stretch between Utah Lake and Great Salt Lake. The National Security Agency runs it on behalf of the Director of National Intelligence. Its stated role is to support the Comprehensive National Cybersecurity Initiative, a federal cybersecurity programme, but the exact mission is classified. The complex covers 1 to 1.5 million square feet, of which 100,000 square feet is data centre space and the rest is technical support and administration. Construction cost $1.5 billion and the site was finished in May 2014.
How it came about
The project was conceived under the Comprehensive National Cybersecurity Initiative and built by the United States Army Corps of Engineers. Inside the NSA it first carried the name Massive Data Repository, later changed to Mission Data Repository because the original sounded too unsettling. Late in construction, repeated electrical surges damaged equipment and pushed the opening back by a year. The facility was expected to begin work in 2013 and was completed in May 2014. Reporting in 2013 linked it to the NSA's wider expansion of data storage, and it became a public symbol of that expansion.
The building and the halls
The finished structure spans 1 to 1.5 million square feet (93,000 to 139,000 m2). Within that, 100,000 square feet (9,300 m2) is data centre space and more than 900,000 square feet (84,000 m2) holds technical support and administrative functions. It is described as a Tier III data centre, a resilience rating meaning planned maintenance can be carried out without shutting down the equipment. Forbes, working from unclassified blueprints, put the storage capacity at 3 to 12 exabytes in 2013, while noting that improvements in technology would raise that figure sharply over time.
Power and cooling
The site drew attention for electrical trouble during construction: large power surges damaged equipment and delayed the opening by about a year. Beyond that episode, no figures for power capacity, energy supply, cooling method or water use are given here.
What runs inside
The centre is meant to hold data for the intelligence community, supporting the Comprehensive National Cybersecurity Initiative. It was expected to take in Internet data along with telephone records from MAINWAY, the NSA call database. Former NSA technical director William Binney said it was built to store recordings and the content of communications, not just call metadata. Critics argue it could hold the full text of private emails, phone calls, search queries and everyday digital records. The NSA rejects claims that it reads or listens to the communications of US citizens unlawfully.
The place
Camp Williams lies near Bluffdale, Utah, on the corridor between Utah Lake and Great Salt Lake. The site is a military installation rather than a city location. No account is given here of land, fibre, climate or tax reasons for choosing it, nor of its local economic effect.
Environment and impact
The centre drew sustained criticism from privacy and civil liberties groups after the 2013 surveillance disclosures. Former NSA contractor Edward Snowden described the project in interview, and filmmaker work based on William Binney's account raised concerns about collection of US citizens' data. In April 2009 Justice Department officials acknowledged that the NSA had over-collected domestic communications beyond the Foreign Intelligence Surveillance Court's authority, calling it unintentional and saying it had been corrected. The NSA stated in April 2013 that allegations about the site's activities were unfounded. James Lewis of the Center for Strategic and International Studies said most stored material is never examined.
Network and links
No fibre routes, subsea cables or internet exchanges connected to the facility are described here.
Questions people ask about Utah Data Center
What is the Utah Data Center for?
It stores data for the United States Intelligence Community and supports the Comprehensive National Cybersecurity Initiative. The National Security Agency leads operations as executive agent for the Director of National Intelligence. The precise mission is classified, so public detail on its work is limited.
How big is the facility?
The complex covers 1 to 1.5 million square feet. Of that, 100,000 square feet is data centre space and more than 900,000 square feet is technical support and administrative space. It is rated Tier III and cost $1.5 billion to build.
How much data can it hold?
It is designed for exabytes or more. Forbes, examining unclassified blueprints, estimated 3 to 12 exabytes as of 2013, and noted that continuing advances in technology would increase capacity by orders of magnitude in later years.
Does it monitor US citizens?
The NSA said in April 2013 that claims it unlawfully reads or listens to US citizens' communications are unfounded. Critics, including former NSA technical director William Binney, have alleged the site stores domestic communications for data mining without warrants.
Where is it?
It stands at Camp Williams near Bluffdale, Utah, in the area between Utah Lake and Great Salt Lake. The United States Army Corps of Engineers built it, and it was completed in May 2014.
Good reading and sources
- Edward Snowden: the whistleblower behind the NSA surveillance revelationsThe Guardian, Article
- Officials Say U.S. Wiretaps Exceeded Law (Published 2009)The New York Times, Article
- Edward Snowden: The Untold StoryWired, Article
- Utah Data Center on WikipediaEncyclopedia
- More photos on Wikimedia CommonsPhotos
- Wikidata recordOpen data
The facts on this page come from the Wikipedia article "Utah Data Center", written by its contributors and used under the CC BY-SA 4.0 licence, and from its Wikidata record (CC0). EveryDatacenter rewrote the text in its own words, with AI assistance, and compares every page with the article to make sure no passage is copied. It may be reused under the same CC BY-SA 4.0 licence with a link back.
It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.