YTL Green Data Center Park
Solar-powered data centre campus in Johor, Malaysia
YTL Power is building a large data centre campus in Kulai, Johor, Malaysia. The project aims for 500 MW of capacity powered by solar energy, with the first phase targeting 48 to 72 MW.
- Planned total capacity of 500 MW in Johor
- First phase expected in service by Q1 2024
- Powered by solar farms on 1,500 adjacent acres
- Sea is the reported anchor tenant
- Secured RM1.1 billion green loan for development
What it is
The YTL Green Data Center Park is a developing infrastructure project in Kulai, Johor, Malaysia. Owned by YTL Power International Berhad, it is designed as a large-scale campus for digital services. The total planned capacity reaches 500 megawatts. The site covers 275 acres and integrates renewable energy generation. YTL DC, a subsidiary of YTL Power, operates the facility. It aims to serve major technology firms requiring substantial computing resources in Southeast Asia.
How it came about
YTL announced the project in August 2022. The plan outlined a 500 MW campus powered by solar energy. Construction began on the first phase, which has a capacity between 48 and 72 megawatts. This initial stage was scheduled to enter service in the first quarter of 2024. In December 2021, prior to this announcement, YTL co-invested in a separate 12.5 MW facility in Singapore. The company also stated intentions to expand its existing five-megawatt site in Sentul, Kuala Lumpur.
The building and the halls
The first building is a three-story structure spanning approximately 535,000 square feet. It contains 24 data halls. The entire park sits on 275 acres of land. Adjacent to this site is another 1,500 acres designated for solar farms. The design targets Gold LEED certification, indicating a focus on environmental standards. Further phases are in the pipeline to reach the full 500 MW target. GDS is also developing facilities within the same campus grounds.
Power and cooling
The campus relies on renewable energy. Approximately 1,500 acres of nearby land will host solar farms to supply electricity. YTL secured RM1.1 billion ($256 million) in Islamic term financing to fund the initial 48 MW development. Maybank and OCBC Bank arranged this green loan under Shariah principles. The financing follows Green Loan Principles published by international market associations. This structure supports the company鈥檚 claim of creating a sustainable circular ecosystem.
What runs inside
Singaporean internet technology firm Sea serves as the anchor tenant for the campus. GDS is also present, developing its own facilities on the site. These tenants suggest a focus on cloud services and content delivery. The scale of the project supports hyperscale operations. YTL Group aims to develop similar campuses in other Southeast Asian nations, including Thailand, the Philippines, Indonesia, and Vietnam.
The place
The facility is located in the Kulai area of Johor, Malaysia. This region offers significant land availability for both the data halls and the associated solar farms. The location supports YTL鈥檚 strategy to expand its digital infrastructure footprint across Southeast Asia. Johor serves as a key hub for regional connectivity and industrial development.
Environment and impact
The project emphasizes sustainability through its green financing and solar power integration. It aims for Gold LEED certification. The development represents a significant investment in local infrastructure. By partnering with international banks for green loans, YTL highlights its commitment to environmental standards. The campus creates a base for major tech tenants like Sea, potentially boosting local digital economy activity.
Questions people ask about YTL Green Data Center Park
Who owns and operates the YTL Green Data Center Park?
YTL Power International Berhad owns the project. It is operated by YTL DC, which is a wholly owned subsidiary of YTL Power. The company manages the development and ongoing operations of the campus in Johor.
What is the power capacity of the data center?
The total planned capacity for the campus is 500 megawatts. The first phase involves a 48 to 72 megawatt facility. This initial stage was expected to become operational in the first quarter of 2024.
How is the data center powered?
The campus is designed to be solar-powered. Approximately 1,500 acres of land adjacent to the 275-acre data center site are designated for planting solar farms. This renewable energy source supports the facility's green certification goals.
Who are the main tenants at the facility?
Singaporean internet technology firm Sea is reported as the anchor tenant. GDS is also developing facilities on the campus. These companies utilize the space for their digital infrastructure and cloud service needs.
Good reading and sources
There is no English Wikipedia article on YTL Green Data Center Park yet, so the facts on this page come from the sources listed above: datacenterdynamics.com/en/news/ytl-secures-256m-green-loan-for-johor-d. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.