QTS operates the Richmond 1 campus in Virginia, a multi-building facility spanning over 200 acres. It features 2.3 million square feet of space, LEED Gold certification, and on-site solar power, serving as a major connected hub in the region.

Share on WhatsApp

  • Spans more than 200 acres in Richmond, Virginia
  • Features 2.3 million square feet of current space
  • Uses closed-loop cooling to eliminate ongoing water use
  • LEED Gold Certified with on-site solar power system
  • Located near an undersea cable landing station

What it is

The QTS Richmond campus, also known as Richmond 1, is a large data centre facility located in Virginia. Operated by QTS, it spans more than 200 acres and represents one of three such facilities the company runs in the Richmond area. The site currently offers 2.3 million square feet of space across multiple buildings. It is designed to be highly connected and energy efficient, holding LEED Gold certification. The campus serves as a significant infrastructure hub for the region, supporting various digital workloads with a focus on resilience and sustainability.

How it came about

The campus was developed as a master-planned project intended to feature six distinct facilities. While specific construction dates are not detailed in the provided material, the site has evolved into the largest and most connected data centre campus in its immediate area. QTS continues to expand its presence in Virginia, with this campus forming a key part of its regional strategy. The company highlights its long-term commitment to the state and its communities through ongoing operations and development at this location.

The building and the halls

The site covers more than 200 acres and includes multiple buildings, with plans for a total of six facilities. Current available space amounts to 2.3 million square feet. The buildings are LEED Gold Certified, indicating a focus on environmental design and efficiency. The campus includes dedicated electric vehicle charging spots for visitors and staff. Its design prioritizes connectivity and resilience, aiming to provide a world-class experience for clients. The layout supports large-scale operations while maintaining adherence to green building standards.

Power and cooling

The campus utilizes an on-site solar panel power system to contribute to its energy needs. QTS reports achieving 100 per cent utilisation of carbon-free operational electricity across its portfolio. For cooling, the facility uses a closed-loop system that recirculates water, eliminating the need for ongoing water consumption typical of evaporative systems. This approach significantly reduces water usage effectiveness. The combination of renewable energy sources and efficient cooling technologies supports the facility's sustainability goals.

What runs inside

The facility serves a range of clients, including federal agencies that require high levels of security and compliance for sensitive workloads. It supports mission-critical operations where risk reduction and assurance are paramount. As a colocation provider, QTS offers space and infrastructure for enterprises needing resilient digital environments. The campus is positioned as a highly connected hub, likely facilitating interconnection for various network providers and cloud services, though specific tenant names are not listed.

The place

Located in Richmond, Virginia, the campus benefits from its position in a state where QTS has deep community ties. The company emphasizes its commitment to Virginia鈥檚 growth and success. The site is situated near an undersea cable landing station, enhancing its connectivity value. This proximity to critical network infrastructure makes it a strategic location for data-intensive operations. The suburban setting allows for the large land footprint required for such a multi-building campus.

Environment and impact

QTS highlights its environmental efforts, noting a 46 per cent year-over-year reduction in water usage effectiveness across its portfolio. The closed-loop cooling system plays a key role in minimizing local water demand. The company also engages in community partnerships, investing in charitable organizations and supporting local initiatives. Employees participate in volunteer activities, such as supporting food waste reduction projects. These efforts aim to build lasting local partnerships and reduce the environmental footprint of data centre operations.

Network and links

The campus is described as the most connected data centre in the area. Its location near an undersea cable landing station provides direct access to global network routes. This proximity enhances latency and bandwidth capabilities for tenants. While specific fibre providers or internet exchange points are not named, the emphasis on connectivity suggests a robust ecosystem of network carriers and peering opportunities available to customers at the site.

Questions people ask about QTS Richmond campus

Where is the QTS Richmond campus located?

The campus is located in Richmond, Virginia, in the United States. It spans more than 200 acres and is one of three QTS facilities in the Richmond area.

How does the campus manage its water usage?

It uses a closed-loop cooling system that recirculates water within the system. This method eliminates the ongoing water demand typically associated with evaporative cooling systems.

What is the size of the facility?

The campus currently features 2.3 million square feet of space across multiple buildings. It is master-planned to eventually include six facilities in total.

Is the facility environmentally certified?

Yes, the campus is LEED Gold Certified. It also features an on-site solar panel power system and uses carbon-free operational electricity.

Good reading and sources

    Where this page comes from

    There is no English Wikipedia article on QTS Richmond campus yet, so the facts on this page come from the sources listed above: q.com/data-centers/richmond-1/, datacenterdynamics.com/en/news/qts-plans-15m-sq-ft-expansion-at-henric. Some are the subject's own pages, so its claims about itself are reported as its claims. EveryDatacenter wrote the text in its own words, with AI assistance, and compares it with the sources to make sure no passage is copied.

    It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.

    The weekly digest

    Every Monday: the data centre of the day, new pages on EveryDatacenter, and the conferences and anniversaries of the week ahead.