Grid power
Power bought from the local grid. 163 data centres on EveryDatacenter so far.
Most data centres take their power from the local grid through a substation on or near the site. A large campus may need 100 MW to more than 1 GW, as much as a city. The mix of coal, gas, nuclear, hydro, wind and solar in that grid decides most of a data centre's carbon footprint. Data centres used about 415 TWh of electricity in 2024, about 1.5% of the world's total, according to the IEA.
Getting connected
A new campus needs a grid connection, often a new high-voltage line and substation. In busy markets the wait for power is now the main limit on growth: Dominion Energy in Virginia, EirGrid in Ireland and the grid companies of west London, Amsterdam and Singapore have all slowed or rationed new connections. Operators back up the grid with batteries (UPS systems) and diesel or gas generators that start within seconds of a failure.
Share of demand
Data centres used about 4.4% of US electricity in 2023, according to the Lawrence Berkeley National Laboratory, and about 21% of Ireland's metered electricity that year, according to the Irish Central Statistics Office. The IEA expects world data centre use to roughly double to about 945 TWh by 2030, led by AI. Utilities argue over who should pay for the new lines, and several US states have set special tariffs for very large loads.
Famous grid power data centres
Further reading
Photo credits on this page
The small pictures above come from Wikimedia Commons under free licences. Some are cropped to fit.
- Utah Data Center: User:ParkerHiggins ( Electronic Frontier Foundation ), CC0, source
- HP Performance Optimized Datacenter: Raysonho @ Open Grid Scheduler / Grid Engine, CC BY-SA 3.0, source
- SciNet: Sy maple, CC BY-SA 3.0, source
- Digital Realty: Raysonho @ Open Grid Scheduler / Scalable Grid Engine, CC0, source
- Equinix: Equinix, Inc., CC BY-SA 4.0, source