Grid power

Power bought from the local grid. 164 data centres on EveryDatacenter so far.

Most data centres take their power from the local grid through a substation on or near the site. A large campus may need 100 MW to more than 1 GW, as much as a city. The mix of coal, gas, nuclear, hydro, wind and solar in that grid decides most of a data centre's carbon footprint. Data centres used about 415 TWh of electricity in 2024, about 1.5% of the world's total, according to the IEA.

Getting connected

A new campus needs a grid connection, often a new high-voltage line and substation. In busy markets the wait for power is now the main limit on growth: Dominion Energy in Virginia, EirGrid in Ireland and the grid companies of west London, Amsterdam and Singapore have all slowed or rationed new connections. Operators back up the grid with batteries (UPS systems) and diesel or gas generators that start within seconds of a failure.

Share of demand

Data centres used about 4.4% of US electricity in 2023, according to the Lawrence Berkeley National Laboratory, and about 21% of Ireland's metered electricity that year, according to the Irish Central Statistics Office. The IEA expects world data centre use to roughly double to about 945 TWh by 2030, led by AI. Utilities argue over who should pay for the new lines, and several US states have set special tariffs for very large loads.

Famous grid power data centres

Further reading

XAI Colossus 馃嚭馃嚫 United StatesXAI Colossus A cluster of AI data centres in Memphis and Southaven for training large language models.AI campus 路 Gas STT GDC Kolkata campus 馃嚠馃嚦 IndiaSTT GDC Kolkata campus Two enterprise data centres in Kolkata, India, run by STT GDC.Colocation 路 Grid power 路 2009 Sify Noida campus 馃嚠馃嚦 IndiaSify Noida campus Hyperscale and AI data centre campus in Noida, India.Hyperscale 路 Grid power ODATA Quer茅taro campus 馃嚥馃嚱 MexicoODATA Quer茅taro campus Four hyperscale data centres in Quer茅taro, MexicoHyperscale 路 Grid power 路 2022 Sify Rabale campus 馃嚠馃嚦 IndiaSify Rabale campus AI-ready hyperscale data centre campus in Navi MumbaiHyperscale 路 Grid power ODATA 馃嚙馃嚪 Brazil and 2 moreODATA Hyperscale data centre operator in Latin AmericaHyperscale 路 Grid power 路 2015 Microsoft Fairwater Wisconsin 馃嚭馃嚫 United StatesMicrosoft Fairwater Wisconsin AI supercomputer campus in Mount Pleasant, WisconsinAI campus 路 Grid power 路 2025 Microsoft Hyderabad data centr 馃嚠馃嚦 IndiaMicrosoft Hyderabad data centre campus Microsoft cloud region in Hyderabad with three availability zones.Hyperscale 路 Grid power 路 2022 EDGE2 Jakarta 馃嚠馃嚛 IndonesiaEDGE2 Jakarta AI-ready data centre in downtown Jakarta with 23 MW capacity.Colocation 路 Grid power 路 2024 Khazna Data Centers 馃嚘馃嚜 United Arab EmiratesKhazna Data Centers Hyperscale data centre operator in the United Arab EmiratesHyperscale 路 Grid power CtrlS Chennai campus 馃嚠馃嚦 IndiaCtrlS Chennai campus Hyperscale data centre park in Ambattur, Chennai.Hyperscale 路 Grid power 路 2025 CtrlS Noida campus 馃嚠馃嚦 IndiaCtrlS Noida campus Hyperscale data centre in Noida with solar power and liquid cooling.Hyperscale 路 Grid power NTT Tokyo Inzai campus 馃嚡馃嚨 JapanNTT Tokyo Inzai campus 50 MW colocation campus in Shiroi City for AI and cloud workloads.Colocation 路 Grid power 路 2027 Yotta G1 馃嚠馃嚦 IndiaYotta G1 Colocation and cloud data centre in GIFT City, GujaratColocation 路 Grid power 路 2024 Microsoft Malaysia data centre 馃嚥馃嚲 MalaysiaMicrosoft Malaysia data centres Two cloud regions in Malaysia for Azure and AI workloadsHyperscale 路 Grid power 路 2025

Photo credits on this page

The small pictures above come from Wikimedia Commons under free licences. Some are cropped to fit.

  • Utah Data Center: User:ParkerHiggins ( Electronic Frontier Foundation ), CC0, source
  • Digital Realty: Raysonho @ Open Grid Scheduler / Scalable Grid Engine, CC0, source
  • Equinix: Equinix, Inc., CC BY-SA 4.0, source

The weekly digest

Every Monday: the data centre of the day, new pages on EveryDatacenter, and the conferences and anniversaries of the week ahead.