Grid power

Power bought from the local grid. 164 data centres on EveryDatacenter so far.

Most data centres take their power from the local grid through a substation on or near the site. A large campus may need 100 MW to more than 1 GW, as much as a city. The mix of coal, gas, nuclear, hydro, wind and solar in that grid decides most of a data centre's carbon footprint. Data centres used about 415 TWh of electricity in 2024, about 1.5% of the world's total, according to the IEA.

Getting connected

A new campus needs a grid connection, often a new high-voltage line and substation. In busy markets the wait for power is now the main limit on growth: Dominion Energy in Virginia, EirGrid in Ireland and the grid companies of west London, Amsterdam and Singapore have all slowed or rationed new connections. Operators back up the grid with batteries (UPS systems) and diesel or gas generators that start within seconds of a failure.

Share of demand

Data centres used about 4.4% of US electricity in 2023, according to the Lawrence Berkeley National Laboratory, and about 21% of Ireland's metered electricity that year, according to the Irish Central Statistics Office. The IEA expects world data centre use to roughly double to about 945 TWh by 2030, led by AI. Utilities argue over who should pay for the new lines, and several US states have set special tariffs for very large loads.

Famous grid power data centres

Further reading

Sify Noida campus 馃嚠馃嚦 IndiaSify Noida campus Hyperscale and AI data centre campus in Noida, India.Hyperscale 路 Grid power NTT Chennai 2 馃嚠馃嚦 IndiaNTT Chennai 2 Hyperscale data centre campus in Ambattur, ChennaiHyperscale 路 Grid power 路 2025 Princeton Digital Group Mumbai 馃嚠馃嚦 IndiaPrinceton Digital Group Mumbai campus Hyperscale data centre campus in Navi Mumbai, IndiaHyperscale 路 Grid power 路 2022 ODATA Quer茅taro campus 馃嚥馃嚱 MexicoODATA Quer茅taro campus Four hyperscale data centres in Quer茅taro, MexicoHyperscale 路 Grid power 路 2022 Sify Chennai campus 馃嚠馃嚦 IndiaSify Chennai campus Two data centre sites in Chennai run by Sify Technologies.Hyperscale 路 Grid power 路 2024 AdaniConneX 馃嚠馃嚦 IndiaAdaniConneX Joint venture building data centres across IndiaHyperscale 路 Grid power Sify Rabale campus 馃嚠馃嚦 IndiaSify Rabale campus AI-ready hyperscale data centre campus in Navi MumbaiHyperscale 路 Grid power Vantage Data Centers 馃嚭馃嚫 United StatesVantage Data Centers Global operator of hyperscale data centre campusesHyperscale 路 Grid power ODATA 馃嚙馃嚪 Brazil and 2 moreODATA Hyperscale data centre operator in Latin AmericaHyperscale 路 Grid power 路 2015 Compass Red Oak campus 馃嚭馃嚫 United StatesCompass Red Oak campus A 400 MW data centre campus in Red Oak, Texas.Hyperscale 路 Grid power Microsoft Fairwater Wisconsin 馃嚭馃嚫 United StatesMicrosoft Fairwater Wisconsin AI supercomputer campus in Mount Pleasant, WisconsinAI campus 路 Grid power 路 2025 AirTrunk HK1 馃嚟馃嚢 Hong KongAirTrunk HK1 Hyperscale data centre in Tsuen Wan, Hong KongHyperscale 路 Grid power 路 2020 AirTrunk TOK1 馃嚡馃嚨 JapanAirTrunk TOK1 Hyperscale data centre campus in Inzai, TokyoHyperscale 路 Grid power 路 2021 Microsoft Hyderabad data centr 馃嚠馃嚦 IndiaMicrosoft Hyderabad data centre campus Microsoft cloud region in Hyderabad with three availability zones.Hyperscale 路 Grid power 路 2022 Chindata Group 馃嚚馃嚦 China and 2 moreChindata Group Asian data centre operator with facilities in China, Malaysia and ThailandHyperscale 路 Grid power 路 2015 Khazna Data Centers 馃嚘馃嚜 United Arab EmiratesKhazna Data Centers Hyperscale data centre operator in the United Arab EmiratesHyperscale 路 Grid power CtrlS Navi Mumbai campus 馃嚠馃嚦 IndiaCtrlS Navi Mumbai campus Hyperscale data centre campus in Navi Mumbai with renewable power.Hyperscale 路 Grid power CtrlS Chennai campus 馃嚠馃嚦 IndiaCtrlS Chennai campus Hyperscale data centre park in Ambattur, Chennai.Hyperscale 路 Grid power 路 2025 CtrlS Noida campus 馃嚠馃嚦 IndiaCtrlS Noida campus Hyperscale data centre in Noida with solar power and liquid cooling.Hyperscale 路 Grid power AirTrunk MEL1 馃嚘馃嚭 AustraliaAirTrunk MEL1 Hyperscale data centre campus in Western Melbourne.Hyperscale 路 Grid power 路 2017 AdaniConneX Chennai 1 馃嚠馃嚦 IndiaAdaniConneX Chennai 1 Hyperscale colocation facility in SIPCOT IT Park, Chennai.Hyperscale 路 Wind and solar Microsoft Malaysia data centre 馃嚥馃嚲 MalaysiaMicrosoft Malaysia data centres Two cloud regions in Malaysia for Azure and AI workloadsHyperscale 路 Grid power 路 2025

Photo credits on this page

The small pictures above come from Wikimedia Commons under free licences. Some are cropped to fit.

  • Utah Data Center: User:ParkerHiggins ( Electronic Frontier Foundation ), CC0, source
  • Digital Realty: Raysonho @ Open Grid Scheduler / Scalable Grid Engine, CC0, source
  • Equinix: Equinix, Inc., CC BY-SA 4.0, source

The weekly digest

Every Monday: the data centre of the day, new pages on EveryDatacenter, and the conferences and anniversaries of the week ahead.